As more types of works become allowed under permitted development, it is important that these are undertaken in line with relevant notifications and codes of practice, to ensure high quality outcomes for the people of Stockport. The electronic communications code (“the code”) is set out in Schedule 2 to the Telecommunications Act 1984 as amended by Schedule 3 to the Communications Act 2003 (“the Act”). The code is designed to facilitate the installation and maintenance of electronic communications networks. There are three main resources that provide additional regulations, restrictions, and guidance for code operators, each of these should be adhered to within Stockport:
The Electronic Communications Code (Conditions and Restrictions) Regulations 2003113
The “Cabinet Siting and Pole Siting Code of Practice”114
The “Code of practice for wireless network development in England”115
Applications for major developments submitted must demonstrate how they will contribute towards a radically digital Stockport116, providing optimal levels of digital connectivity available at the time as part of the scheme; this should be set out in a statement accompanying the proposal.
Where a planning application is submitted for telecommunications development, the possibility of sharing facilities, such as masts, cabinet boxes and satellite dishes, and erecting antennae on existing buildings or other structures should be fully explored through information supporting the planning application at the time of validation. Planning applications should also be accompanied by a signed declaration that the equipment and installation has been designed to be in full compliance with the requirements of the radio frequency public exposure guidelines of the International Commission on Non-Ionizing Radiation Protection (ICNIRP).
Major development will be required to take an integrated, nature-based approach to protect the quantity and quality of water bodies and managing flood risk, by:
Returning rivers and water courses to a more natural state, where practicable, in line with the North West River Basin Management Plan;