play strategy detailing how the relevant policy requirements will be met and continue to be met in perpetuity.

8. Heritage assessments

Applications for development at the following sites must be accompanied by a heritage assessment in accordance with the requirements of clause 5 of policy ENV 19, including having regard to cumulative impacts with other nearby development:

HOM 2.3 Land off StationRoad, ReddishHOM 2.25 Land at Cheadle Hulme School
HOM 2.6 Former Cheadle BrickworksHOM 2.27 Jenny LaneHOM 2.28 and b Mill Lane(Hazel Grove)
HOM 2.7 Land off MidlandRoadHOM 2.29 High Lane Farm(Woodley):
HOM 2.8 Land off AdswoodRoadHOM 2.30 Sanderling RoadHOM 2.31 Compstall RoadNorth
HOM 2.9 Cheadle HulmeStationHOM 2.32 Compstall RoadSouth
HOM 2.10 Romiley Board MillHOM 2.34 Shakespeare Road
HOM 2.12 Compstall MillsHOM 2.35 Bolshaw Road
HOM 2.13 Former OffertonHigh SchoolHOM 2.36 Heald Green EastHOM 2.37a Land off ChesterRoad(Hazel Grove)
HOM 2.14 Woodford GardenVillage ExtensionHOM 2.37b Norbury HallHOM 2.38 Chester Road(Woodford)
HOM 2.15 Hall Moss LaneHOM 2.39 Land off BuxtonRoad, Hazel Grove
HOM 2.16 High LaneHOM 2.40 Land off Occupiers Lane
HOM 2.17 Hyde BankMeadowsHOM 2.41 Daisy Bank, Heald Green
HOM 2.18 Sandown RoadHOM 2.42
HOM 2.19 Jacksons Lane WestHOM 2.43
HOM 2.20 Jacksons Lane EastHOM 2.44
HOM 2.21 Offerton Sand and GravelHOM 2.45
HOM 2.24 Gravel Bank Road and Unity MillHOM 2.46

9. Other requirements

Additionally, the following site-specific requirements must be met:

  • HOM 2.1 John Street, Hazel Grove

i. Applications for development should explore opportunities to provide a pedestrian and cycle route through the site from the A6 to Mount Pleasant.