===== PAGE 1 =====
Financial Project Identification Number (FPID): 454388-1
## Welcome to the Public Meeting January 13, 2026
===== PAGE 2 =====
## Public Meeting Format
In-Person
January 13, 2026
5:00 p.m. to 6 p.m.
Sheen Auditorium at Eckerd College
4200 54^{th} Avenue S,
St. Petersburg, FL 33711
FDOTTampaBay.com
Project Website
https://www.FDOTTampaBay.com /project/1049/454388-1
===== PAGE 3 =====
## Title VI
This meeting is being conducted in accordance with the Civil Rights Act of 1964. Public participation is solicited without regard to race, color, national origin, age, sex, religion, disability or family status.
To express concern(s) relative to the Department's compliance with Title VI, please contact:
Jensen Hackett
FDOT District 7 Title VI Coordinator
11201 North McKinley Drive
Tampa, FL 33612
(813) 975-6283
Jensen.Hackett@dot.state.fl.us
Aldrin Sanders
State Title VI Coordinator
605 Suwannee Street
Tallahassee, FL 32399
(850) 414-4764
Aldrin.Sanders@dot.state.fl.us
===== PAGE 4 =====
## Project Location and Description
===== PAGE 5 =====
## Existing Conditions
Study Begin
Legend
Right-of-way
Study End
===== PAGE 6 =====
## Public Meeting – December 10, 2024
• 47 attendees
• Summary of Public Input Received
• Signalization
• Turn lane improvements
• Intersection visibility
• Parking and sight distance concerns
- Signal timing, signage, and pavement marking enhancements
• Requests for improved U-turn and merge configurations
• Pedestrian and bicycle safety improvements
- Toll plaza signage, lighting, and lane configuration feedback
===== PAGE 7 =====
## Potential Improvements
Signal Warrant Analysis
(Did Not Meet Criteria)
MPH
45
Optical Speed Bars
Speed Limit
Pavement Markings
P
Add Westbound Right Turn Lane
Temporary Portable Radar
Speed Feedback Sign
Add Buffered Receiving Lane
for Southbound Left Turns
BAHIA DEL MAR BLVD
Increased Signage to Direct Pedestrians to Crossing near Bridge
Legend
Short Term Medium Term Long Term
===== PAGE 8 =====
## Potential Improvements
Add Raised Island for Southbound Right Movements
Remove
Acceleration Taper
LA PUERTA DEL SOL BLVD
Install supplemental
traffic signal head
Legend
Short Term
Medium Term
Long Term
===== PAGE 9 =====
## Potential Improvements
## Guideline striping to delineate Eastbound Left Movements
Legend
Short Term
Medium Term
Long Term
7
===== PAGE 10 =====
## Potential Improvements
Update Pavement Markings to include Merge Ahead Add overhead signs and pavement markings for lane guidance
Install "No Stopping" Pavement Markings
Signal Warrant Analysis
(Did Not Meet Criteria)
Add Buffered Receiving Lane
for Northbound Left Turns
Temporary Portable Radar
Speed Feedback Sign
Legend
Short Term
Medium Term
Long Term
Optical Speed Bars
MPH
Speed Limit
Pavement Markings
LANDINGS DR
===== PAGE 11 =====
## Potential Improvements
Review signal timing and separation of left turn
Install ped/bike
activated warning signs
Signal Warrant
Analysis (Did Not
Meet Criteria)
Install pedestrian-activated blank-out sign to alert turning drivers that they are required to stop for pedestrians
Widen Buffered Bike Lanes Legend Short Term Medium Term Long Term
===== PAGE 12 =====
## More Information
## Pinellas Bayway Multimodal Feasibility Study 454388-1
Map Satellite
Sign-up to receive email alerts for this project
##
The Pinellas Bayway Multimodal Feasibility Study will evaluate potential corridor improvements along SR 682 between Bahia Del Mar Blvd. and 41st St. in Pinellas County.
The study is based on engaging the communities to develop a clear understanding of citizen concerns along the corridor and conducting a feasibility study to determine possible countermeasures.
To fill out the survey for this study click here: SR 682 Pinellas Bayway Survey (arcgis.com)
## Closures
## Project Details
Work Type Study/Transportation Planning
Phase Study
Limits
SR 682/Pinellas Bayway
From Bahia Del Mar Blvd
S To 41st S
Length 2.278 Miles
Road 54th Ave
SR 682
##
Study Manager
Alex Henry
813-975-6772
Alex.Henry@dot.state.fl.us
Kris Carson
813-975-6060
Kristen.Carson@dot.state.fl.us
Project Website:
https://www.fdottampabay.com/project/1049/454388-1
===== PAGE 13 =====
## IF YOU FEEL DIFFERENT YOU DRIVE DIFFERENT DRIVE HIGH GET A DUI
===== PAGE 14 =====
## You have now reached the end of the presentation
## Thank you for watching this presentation for the Pinellas Bayway Feasibility Study