PROJECTGOALRESULTS / COMMENTS
39Boiler EPA ViolationsCorrect violations and letters of warningAction Plan submitted December 2011; second draft submitted May 2012
40Replace Chandler Hall Domestic BoilerReplace boiler to provide hot waterComplete
41Develop a Technical Training Program to Support APPA Level 2 Standards for Custodial, Grounds, and Maintenance OperationsResearch initiatives currently being implemented for a technical training program.
42Cleaning Out and Disposing of Items in Red Barn and Surplus VehiclesOperation is being overseen by Purchasing
43Cheaney PlazaFundraising bricks and plaquesDesign complete
$500,000 Private donations
Completed Projects
1Repair Concrete Steps & SidewalksSafe Pedestrian pathsComplete
$150,000 Capital Planning
2Erosion Control at Motor poolControl of water runoffComplete
$15,000 Capital Planning
3Flood Damage Repair at Old Federal BuildingRestore buildingComplete
$5,000 Maintenance Operations
4Extend Storm Pipe at Ash PitRoute storm water around ash pitComplete
$5,000 Maintenance Operations
5Repair Roof of Old Federal BuildingStop damage from leaking roofComplete
$13,000 Capital Planning
6Access Control for Governmental Services CenterInstall Blackboard electronic card readersComplete
$20,000 GSC Maintenance Service
7Mills Lane Farm - Center for Sustainable Farms & FamiliesNew FacilityComplete
$4,800,000 USDA
8Aquaculture Production Technology LaboratoryNew FacilityComplete
$1,700,000 CPE