structural stabilization and roof replacement. An official Phase "A" design report is expected in June.

  1. President's House Repairs - Interior repairs pending special board committee direction.
  2. Entrance Gatehouse – Project initiated at the State Finance Department. Architectural concepts were reviewed and designed to provide an entrance Archway and Guardhouse.
  3. Hume Hall Window Repairs –Quotes have been received and a purchase order was issued. Construction began April 18, 2011.
  4. Hathaway Hall Improvements - Project to include top soil replacement, card access to lower level and faculty lounge, chair rail in classrooms, dumpster screen fence, boiler repair, lounge TVs and classroom chairs. Quotes to be requested using state-required wage rates.
  5. Dorm Bathroom Repairs – Description of work prepared and quotes requested in December 2010. Quotes submitted to Housing. Construction to commence during summer 2011.
  6. Additional Campus Parking – Bid documents being prepared for additional parking at Betty White, Academic Annex and Hume Hall. Other sites are being investigated between Chappell Building and McCullin Basketball Courts.
  7. Purchase Aquatic Vessel – Final approval from Capital Projects and Bond Oversight Committee scheduled for January 18, 2011. The vessel is being constructed.
  8. Benches Campus Wide - Locations for campus bench seating have been identified. Potential manufacturers are being researched.
  9. Replace Bradford Hall Auditorium Seating – Potential vendors are being identified and quotes have been requested. Sample chairs were received for review, and quotes have been received.
  10. Capital Plan Submission for 2012/2018 – Electronic submittal of Capital Plan Version 0 was done April 15, 2011. The next submittal, Version 1, is due May 20, 2011.
  11. Atwood Hall Roof Replacement - Funding and written notice from Land Grant to proceed was received. A request was sent to the state to reactivate the project.
  12. Purchase Umbrellas for Student Center – An umbrella selection to be made.
  13. Scoreboards in Football Stadium – Obtaining quotes from vendors.
  14. Replace Carpet in the Carl M. Hill Student Center, Room 312 – A purchase order was issued on the low quote. Vendor ordered the carpet and is waiting on its manufacture.
  15. Purchase Land and Construct Additional Research Ponds – The $4.3 million project was on hold upon selection of land by Land Grant. The project was reactivated February 18, 211. Appraisals are in process for proposed purchase of property.
  16. Paint Coal Silo – Quotes have been received and the requisition is pending.

Page-17