| Indicators for LO 3.1A | AY 2009-2010 | AY 2010-2011 | AY 2011-2012 | AY 2012-2013 | AY 2013-2014 |
|---|
| Baseline data pilot program enacted in 2008-2009 | 20% of students in the sample group will increase EAWC by 10% of the baseline | 25% of students in the sample group will increase EAWC by 15% of the baseline | 30% of students in the sample group will increase EAWC by 20% of the baseline | 35% of students in the sample group will increase EAWC by 25% of the baseline | 40% of students in the sample group will increase EAWC by 30% of the baseline |
|---|
| Learning Outcome 3.1B: Students will think critically and analytically (TCA) |
| Indicators for LO 3.1B | AY 2009-2010 | AY 2010-2011 | AY 2011-2012 | AY 2012-2013 | AY 2013-2014 |
|---|
| Baseline data pilot program enacted in 2008-2009 | 20% of students in the sample group will improve TCA by 5% of the baseline | 25% of students in the sample group will improve TCA by 10% of the baseline | 30% of students in the sample group will improve TCA by 15% of the baseline | 35% of students in the sample group will improve TCA by 20% of the baseline | 40% of students in the sample group will improve TCA by 25% of the baseline |
|---|
| Learning Outcome 3.1C: Students will read with comprehension at the college entry level (RCCEL) |
| Indicators for LO 3.1C | AY 2009-2010 | AY 2010-2011 | AY 2011-2012 | AY 2012-2013 | AY 2013-2014 |
|---|
| Baseline data pilot program enacted in 2008-2009 | 20% of students in the sample group will increase RCCEL by 10% of the baseline | 25% of students in the sample group will increase RCCEL by 15% of the baseline | 30% of students in the sample group will increase RCCEL by 20% of the baseline | 35% of students in the sample group will increase RCCEL by 25% of the baseline | 40% of students in the sample group will increase RCCEL by 30% of the baseline |
|---|
| Learning Outcome 3.1D: Students will use the methods of mathematical and scientific inquiry successfully (Methods of Math and Science Inquiry—MMSI) |
| Indicators for LO 3.1D | AY 2009-2010 | AY 2010-2011 | AY 2011-2012 | AY 2012-2013 | AY 2013-2014 |
|---|
| Baseline data pilot program enacted in 2008-2009 | 20% of students in the sample group will increase MMSI by 10% of the baseline | 25% of students in the sample group will increase MMSI by 15% of the baseline | 30% of students in the sample group will increase MMSI by 20% of the baseline | 35% of students in the sample group will increase MMSI by 25% of the baseline | 40% of students in the sample group will increase MMSI by 30% of the baseline |
|---|