March 27: DDAF Provide Client Assistance List for A-133 Testing and F/S Interim June 8th DDAF to provide Sporting SEA Sample August 19: KSU to provide FINAL SEA

April 10: KSU To Provide FALL listings KSU to Provide Interim SEFA (March 31)

April 17:

DDAF to provide Fall Samples Grants: DDAF to provide selected grants for testing June 12th R&D KSU to provide interim statements SFA: KSU to Upload All Spring SFA information August 24: Final fieldwork (week 2); Grants: finalize all grants testing

April 24:

Grants: KSU to provide expenditure detail through intention SEFA and grant documents/agreements June 22: Interim FS Fieldwork; HB 622 and Lease Law work

May 1st KSU upfront SBA testing documents for Sharesville

May 18 STA: Fall 98A Testing Grants for In�outn geant amp uploaded

May 27: KSU to provide Spring SA listing August 17: Final fieldwork (week 1);

DDAB to provide starting SEA Sample Juno 5k DDAB to provide Spitting 5kA

June 12 PS1 KSU to provide intervention statements SFA: KSU to Upload All Spring SFA information

June 15: Spring SFA testing Prelim Grants Testing

June 22: Interim FS Fieldwork; HB 622 and Lease Law work

July 6:

Provide final client assist list; Prepared confirmations provided to DDAF; Grant expenditures through 6/30 provided

August 7: Final Trial Balance provided to DDAF December 1: Provide client assistance list for Subsequent events audit

August 17. Final fieldwork (week 1);

[13]

August 19: KSU to provide FINAL SEFA

August 24: Final fieldwork (week 2); Grants: finalize all grants testing

September 4 Draft of Financial due to DDAF

September 15: Draft FISAP Due

September 25: Finalize report

December 1: Provide client assistance list for Subsequent events audit

December 7 - 15: Subsequent Event audit