- oFund Source: KSU
- oAppropriation: $250,000.00
- oCash Balance: $230,650.00
- oArchitectural Firm: Patrick D. Murphy Co. Architects, Louisville, Kentucky
- oDesign Fees Allotment: $56,000.00 Construction Allotment: $194,000.00
- oEmergency Repairs Completed by Geoghegan: $19,350.00
- oA study of the entire roof is being prepared
- oKSU made an insurance claim for interior cleanup of water damage and repairs.
Buildings Offline
- The Halls requires a complete renovation - HVAC, plumbing, electrical and life safety improvements. Use of this facility as a residence hall is only possible if the interior walls are reconfigured for modern suite type units. Due to the low ceiling height between floors, the HVAC system will have to be through wall hotel type units or some type of in-room units - variable refrigerant volume units. Floor space and chase space for ductwork required by other systems would reduce the occupancy limit.
- oIn house estimate of $18,043,000.00 in 2015
- Chandler Hall mold remediation is compete.
- Russell Court requires a full renovation of all systems and finishes.
- oCost estimate for renovation in 2014 is
- 2 Apartments plus main electric upgrade - $144,000.00
- Single bedroom apartment - $69,000.00 each x 10 units
- Double bedroom apartment - $80,000.00 each x 8 units
- Total renovation estimate $1,474,000.00