Fund Source: KSU
Appropriation: $250,000.00
Cash Balance: $230,650.00
Architectural Firm: Patrick D. Murphy Co. Architects, Louisville, Kentucky
Design Fees Allotment: $56,000.00 Construction Allotment: $194,000.00
Emergency Repairs Completed by Geoghegan: $19,350.00
A study of the entire roof is being prepared
KSU made an insurance claim for interior cleanup of water damage and repairs.
The Halls requires a complete renovation - HVAC, plumbing, electrical and life safety improvements. Use of this facility as a residence hall is only possible if the interior walls are reconfigured for modern suite type units. Due to the low ceiling height between floors, the HVAC system will have to be through wall hotel type units or some type of in-room units - variable refrigerant volume units. Floor space and chase space for ductwork required by other systems would reduce the occupancy limit.
In house estimate of $18,043,000.00 in 2015
Chandler Hall mold remediation is compete.
Russell Court requires a full renovation of all systems and finishes.
Cost estimate for renovation in 2014 is
2 Apartments plus main electric upgrade - $144,000.00
Single bedroom apartment - $69,000.00 each x 10 units
Double bedroom apartment - $80,000.00 each x 8 units
Total renovation estimate $1,474,000.00