2018-2024 CAPITAL PLAN
PROPOSED CAPITAL PROJECT
FORM SYP-P2
PLAN VERSION - 1
4/17/2017
Completion Date
09/2020
Existing System? Yes
Projects for upgrade of IT network infrastructure.
Projects for upgrade of network will be a continuous process over each biennium.
Both KSU's fiber network and its wireless network need to be expanded and upgraded. The fiber network's current topology needs to convert to a star topology which will require re-installing fiber to each building and terminating each connection at a central fiber hub. Redundant connectivity will insure neat 100% uptime for the network. Create a fully wireless campus where the network can be accessed by students, faculty, staff, alumni and visitors anywhere and anytime while on campus. This will also allow advances in information distribution using handheld devices such as cell phones, I-pods, I-touches, etc. Extend wireless access to KSU's research farm in Franklin County.
Yes
2016-2022 Upgrade Information Tech Infrastructure 2016
2014-2020 Upgrade Information Technology Infrastructure
2012-2018 Upgrade Information Technology Infrastructure
2010-2016 Upgrade Information Technology Infrastructure
Differences between the current and most recent previous project? No
Previous BUDGET REQUESTS? Yes
2014-2016 Upgrade Information Technology Infrastructure
2012-2014 Upgrade Information Technology Infrastructure
Differences between the current and most recent previous project? No
Previous BUDGET AUTHORIZATIONS? Yes
2014-2016 Upgrade Information Technology Infrastructure
2012-2014 Upgrade Information Technology Infrastructure
Most recent authorization undertaken? Yes
Differences between the current and most recent previous project? No
Differences between the current and most recent previous project?
NO