2018-2024 CAPITAL PLAN PROPOSED CAPITAL PROJECT. FORM SYP-P2 PLAN VERSION - 1 4/17/2017
Program Relocation? No
Phased Project? No
Eliminate the need for other proposed projects? No
Need eliminated by other proposed project(s)? No
Additional Description/Justification
--Citation, Order, Agreement with State or Federal Courts or a Regulatory Agency, N/A
--Project Measurements, A communication duct bank consisting of four, three inch conduits are concrete encased and buried. The duct bank passes through 6'x8'x7' deep concrete manholes for maintenance and cable access. The path starts at the Julian Carroll ASB facility and extends in two directions; along US60 to Hathaway Hall and Bradford Hall, the other path crosses US60 and extends buildings south of US60 and ends at the Aquaculture Classroom - Office building. Total length is 6,400 LF. --Site, All campus. --Prior Planning and/or Design, In-house planning for IT network coordination. --Relationship to Other Prior Projects(s), N/A --Economic Development Impact. N/A
Previous CAPITAL PLANS? No
Previous BUDGET REQUESTS? No
Previous BUDGET AUTHORIZATIONS? No
Page 2 of 2 Expand Campus Communications Infrastructure