Fund Source: Institution and Federal Funds (need to identify specific funding source and transfer funds to DECA in order to assign professionals to project)
O Appropriation: TBD
Architectural Firm: TBD
Design Fees Allotment: TBD
Phase A Construction Estimate: $250,000.00
This project will assist the University with long and short range planning, development and improvement of the physical facilities.
Project is needed for SACS accreditation compliance.
No funds have been transferred to state account C8UD
- Emergency Roof Repairs - Exum HPER Center
- State Account No.: C8HZ
- o Fund Source: KSU
- O Appropriation: $250,000.00
- Cash Balance: $230,650.00
- Architectural Firm: Patrick D. Murphy Co. Architects, Louisville, Kentucky
- Design Fees Allotment: $56,000.00 Construction Allotment: $194,000.00
- Emergency Repairs Completed by Geoghegan: $19,350.00
- Status: A study has been prepared for this project with an estimated cost of $1,553,000.00 to replace the entire roof on the William Exum center. Project manager, Carl Kratzer with DECA, has been assigned to complete the design.
- Hunter Hall Renovation Feasibility Study
- State Account No.: C8UH
- o Fund Source: Federal Funds
- ○ Appropriation: $1,900,000.00
- Architectural Firm: TBD
- Design Fees Allotment: TBD
- Status: This project is currently going through a feasibility study to determine adding an elevator; and connecting to the Atwood facility with a covered walkway. The funds will be used to renovate the electrical systems, plumbing and HVAC, as well as to provide office, classroom and meeting space.
- Jordan Building and Warehouse Roof Replacement 2012
State Account No.: C66S
o Fund Source: KSU
O Appropriation: TBD