o Architectural Firm: G. Scott & Associates, Architects, Frankfort, Kentucky

Actual Construction Cost total with changes: $235,250.00

Start: 01/09/2017 Substantial: 06/30/2017 Final Completion: 10/15/2017

Construction Prime Contractor: The Bri-Den Co., Inc., Ashland, Kentucky

Status: The project has been completed.

Bid

  1. Renovate Atwood Ag Research Building
  2. State Account No.: C751
  3. o Fund Source: Federal Funds
  4. O Appropriation: $12,368,000.00
  5. Architectural Firm: Omni Architects, Lexington, Kentucky
  6. Design Fees Allotment: $369,420.00
  7. Phase A Construction Estimate: $6,592,675.00
  8. o Funds are pending approval of architectural design fee from the USDA
  9. A plan has been developed to renovate the building and later build an adjoining Agriculture Experiential Learning Center next to the current Atwood Research Facility and create the ‘Atwood Research Facility and Agricultural Experiential Learning Center’.
  10. This project is entering a bidding phase; and a final contract step was recently approved by the USDA. Project manager, Bernard Engelman, with Division of Engineering & Contract Administration (DECA) has also been assigned to complete the design.
  11. Modular Units for Agricultural Research

State Account No.: C8CD

o Fund Source: Land Grant

○ Appropriation: $573,473.00

Cash Balance: $526,738.50

Architectural Firm: Greystone Architects, Frankfort, Kentucky

Actual Construction Cost total with changes: $561,500.00

Bid Date 6/8/2017

○ Construction Prime Contractor: Jacobs Group, Louisville, Kentucky

Status: The project has been canceled.

Design

1. University Campus Master Plan

State Account No.: C8UD