| Long Term Replacement | 14 | $/Sq Ft | $ 6.05 | $/Sq Ft Shingle | | |
|---|
| Bell Gym | 18,800 | 18,800 | $ 267,338 | $ 66,835 | $ 334,173 | Shingle Roof |
|---|
| HILLCREST | 4,518 | 4,518 | $ 27,325 | $ 6,831 | $ 34,156 |
|---|
| MARYLAND WAREHOUSE | 12,551 | 3,765 | $ 53,543 | $ 13,386 | $ 66,929 |
|---|
| Long Term Replacement Total | 35,869 | 27,083 | | | $ 435,258 | 3 |
|---|
| | | | | | |
| Total Repair Maintenance Cost | 301,522 | 258,068 | $ 4,520,738 | $ 1,119,053 | $5,639,791 | 19 |
|---|
| | | | | | |
| Roof Projects Completed | | | | | | |
|---|
| Alumni Dressing Room | 20,400 | 0 | Completed Summer 2014 | | | |
|---|
| Atwood | 16,354 | 0 | Completed Fall 2011 | | | |
|---|
| Bradford Hall | 40,400 | 0 | Completed Spring 2011 | | | |
|---|
| Chandler Hall | 9,075 | 0 | Completed Spring 2009 | | | |
|---|
| Combs Hall | 6,300 | 0 | Completed Spring 2009 | | | |
|---|
| Downtown Annex | | 0 | Completed 2012 | | | |
|---|
| Hill Student Center | 21,000 | 0 | Completed Spring 2009 | | | |
|---|
| Jordan Warehouse, Boiler, Chiller | 8,703 | 0 | Completed Winter 2013 | | | |
|---|
| Russell Court Apartments | 5,558 | 0 | Completed Fall 2013 | | | |
|---|
| Underwood Cafeteria | 20,400 | 0 | Completed Spring 2009 | | | |
|---|
| Completed Total | 148,190 | 0 | | $ - | 10 | |
|---|
| | | | | | |
| | | | | | |
| | | | | | |
| No Issues / Needs Found | | | | | | |
|---|
| Building Name | | | Square Feet | Roof Type | | |
|---|
| ACADEMIC ANNEX | | | | Metal | | |
|---|
| AQUACULTURE CLASSROOM | | | | Metal | | |
|---|
| AQUACULTURE PRODUCTION TECHNOLOGY LAB | | | | Metal | | |
|---|
| CARVER Hall | | | | Built Up | | |
|---|
| CHAPPELL COMMUNITY ED CENTER | | | | Shingle | | |
|---|
| E DUGOUT-BASEBL FLD | | | | Concrete | | |
|---|
| FISH HATCERY BLDG | | | | Metal | | |
|---|
| Guard House | | | | Built Up | | |
|---|
| Hathaway | | | 19,818 | Built Up | | |
|---|
| Hunter | | | 7,388 | Built Up | | |
|---|
| Jackson | | | 5,289 | Built Up | | |
|---|
| JONESFIELD HOUSE | | | | Shingle | | |
|---|
| NUTRITION LABORATORY | | | | Shingle | | |
|---|
| POLE BARN/AQUACULTURE | | | | Metal | | |
|---|
| ROSENWALD CENTER FOR FAMILIES AND CHILDREN | | | | Built Up / Metal | | |
|---|
| SHAUNTEE HALL | [59] | | | Built Up / Metal | | |
|---|
| The Halls Lower | | | 6,288 | Built Up | | |
|---|
| The Halls Upper | | | 25,261 | Built Up | | |
|---|
| W DUGOUT-BASEBL FLD | | | | Concrete | | |
|---|
| WHITNEY M. YOUNG Jr. | | | | Built Up / Metal | | |
|---|
| 20 | | | | | | |
|---|
- Long Term Replacement Total 35,869 27,083 $ 435,258
- Total Repair Maintenance Cost 301,522 258,068 $ 4,520,738 $ 1,119,053 $ 5,639,791
- Completed Total 148,190 0 $ -