Capital Planning & Construction3753/27/159/1/16$ 11,356,000
Campus Wide514/20/156/29/15$ 212,000
5 Exterior Building Signs66/22/156/29/15$ 25,000
Emergency Contingency64/20/154/27/15$ 24,000
Sidewalk Utility Tunnel Caulking35/15/155/19/15$ 6,000
Concrete Sidewalk Repairs55/15/155/21/15$ 12,000
Concrete Curb & Gutter Repair55/15/155/21/15$ 12,000
Parking lot sealcoat & stripe15/22/155/22/15$ 120,000
Paint light poles35/15/155/19/15$ 13,000
Repair Boilers and Aging
Distribution Lines3753/27/159/1/16$ 10,400,000
Carroll ASB513/27/156/5/15$ 44,000
ASB concrete Stair Repairs63/27/154/3/15$ 10,000
Lighting upgrade105/25/156/5/15$ 34,000
Chandler, Combs, Kentucky, & The
Halls106/8/156/19/15$ 15,000
Replace leaking cast iron drain traps in Dorms106/8/156/19/15$ 15,000
Chandler, Kentucky, McCullin and The Halls106/15/156/26/15$ 255,000
Upgrade Fire Alarm Systems106/15/156/26/15$ 255,000
Hunter Hall105/18/155/29/15$ 200,000
Upgrade and Repair Restrooms in Hunter Hall105/18/155/29/15$ 200,000
Old Guard Armory56/1/156/5/15$ 75,000
Armory Exterior Repairs56/1/156/5/15$ 75,000
Russell Court Apts.54/20/154/24/15$ 20,000
Russell Court concrete Repairs54/20/154/24/15$ 20,000
The Halls34/13/154/15/15$ 5,000
The Halls Concrete Deck Repair34/13/154/15/15$ 5,000
Underwood Cafeteria594/13/157/2/15$ 65,000
Boiler Chimney Revisions34/13/154/15/15$ 15,000
Refurbish and Replace control on Elevator in McCullin Hall166/11/157/2/15$ 50,000
VEHICLES14/13/154/13/15$ 40,800
Fork Truck14/13/154/13/15$ 16,800
Purchase 2 Electric Service Trucks14/13/154/13/15$ 24,000