KENTUCKY STATE UNIVERSITY
Board of Regents
State Account Number C916
Scope of Work – Replace and reposition emergency generator at the chilled water plant. Contract of $296,000 awarded to Kentuckyana Electrical Services; the generator was installed August 3 and all is fully operational.
State Account Number C96P
Scope of Work – Replace exterior stairs at north end of building.
Bid documents are ready to advertise; construction estimate is $70,000.
Construction on hold pending full funding for construction.
State Account Number C96Q
Scope of Work – Design on campus softball field – awaiting revised cost estimate before deciding to proceed. Preliminary budget of $48,000.
State Account Number C97F
Scope of Work – Mold remediation; project budget $25,000 – portions of finish work is still to be completed.
State Account Number C97Y
Scope of Work – Wiring to install access control system at Hume Hall Preliminary budget is $10,000.