KENTUCKY STATE UNIVERSITY Board of Regents
• Install Signage and Lighting on Pedway
State Account Number C95V
Scope of Work – Design/Install KSU identification signage and lighting on pedway roof that crosses US 60. Phase C Design Documents are complete with an estimated construction cost is $106,000.
Project will be advertised for bidding – Anticipated completion date of late January 2020.
• Old Young Hall (The Halls) HVAC Upgrades
State Account Number C8XN
Scope of Work – Remediation of mold and replacement of air handling units throughout with new hot water heaters and fire alarm system integration. Work is complete; students began occupying building on August 3, 2019.
• Develop Master Plan
State Account Number C913
Scope of Work – Develop campus master plan. Omni has performed preliminary fact finding work and is poised to continue under KSU's direction and the provision of funding for the work to continue.
• Design Study for Shauntee Hall
State Account Number C914
Scope of Work – Develop Cost Estimate and initial design concept to convert Shauntee Hall to Nursing Education facility.
Study received – Administration to review and determine how the Nursing program will be best served. No estimates have been developed at this time.
• Campus Roof Evaluation and Repair
State Account Number C915
Scope of Work – Evaluate issues and develop repair estimates for campus buildings with roof problems. Report received April 2019.
Total estimated cost for design and construction is $9,300,000.
Administration has received financing assumptions from the state Office of Financial Management for financing opportunities. No action is being taken at this time.