Post-Delivery

Electric Hookup

Connecting your farm to a power source is the first thing you should do when your farm arrives. It is strongly recommended that this is done by a licensed professional electrician to ensure the safety of everyone. Be sure to schedule a time with an electrician so that your farm is powered within a few days of delivery at the most.

Electrical Details:

  • The Greenery has a 100 amp dual pole main breaker.
  • The electrical panel that you are connecting the Greenery to should provide a 100 amp service. If it does not, consult with your electrician to see how to upgrade the service.
  • The connection should be a 120/240 volt, single phase connection, OR 208 volt, 3-phase with the 3rd phase capped.

Please consult with electrician to install an additional weather-proof outlet in proximity to the water fill valve for powering the electric heat cable to prevent freezing of the water pipe.