Pre-Delivery

Site Preparation:

  • Prepare a 50' x 10' trap rock pad with a maximum grade of 3%. Container can also be placed on concrete/asphalt if already present.

Water/Electric Scouting

  • Locate the closest electrical source and site voltage (110/220V single phase, 120/240V single phase, 120/208V three phase).
  • Locate water access within 50 feet of the container farm.

WIFI Access

  • Ensure site has strong WIFI connection. If not, install router near container farm location.