Pre-Delivery
Site Preparation:
Prepare a 50' x 10' trap rock pad with a maximum grade of 3%. Container can also be placed on concrete/asphalt if already present.
Water/Electric Scouting
Locate the closest electrical source and site voltage (110/220V single phase, 120/240V single phase, 120/208V three phase).
Locate water access within 50 feet of the container farm.
WIFI Access
Ensure site has strong WIFI connection. If not, install router near container farm location.