309 - ARCHITECT-ENGINEERS ESTIMATE OF CONSTRUCTION COST PHASE "A" - SCHEMATIC DESIGN

Project Name: KSU Nutrition Building HVAC

Location: Frankfort, Kentucky

ville No.: 435-CB1E-KS43-00

  • a. SITE WORK
  • 1.0 Demolition $ -
  • 2.0 Clearing $ -
  • 3.0 Grading $ -
  • 4.0 Paving $ -
  • 5.0 Concrete $ 3,900
  • 6.0 Planting $ -
  • 7.0 Miscellaneous Items (Identify) $ -
  • EXTERIOR ELECTRICAL $ -
  • UTILITY RELOCATION $ -
  • EXTERIOR MECHANICAL $ -
  • TOTAL SITE WORK: $ 3,900
  • a. OFF-SITE UTILITIES
  • a. BUILDING CONSTRUCTION
  • General Construction Total: $ -
  • 4.0 Control Systems $ -
  • Mechanical Subtotal: $ 395,967
  • Electric Safety & Security $ -
  • Electrical Subtotal: $ 39,804
  • TOTAL BUILDING CONSTRUCTION: $ 435,771
  • TOTAL SITE WORK, SITE UTILITIES, & BUILDING CONSTRUCTION: $ 439,671
  • 1.0 (Identify Utilities) $ -
  • TOTAL SITE UTILITIES: $ -
  • 1.0 Structural $ -
  • 2.0 Architectural $ -
  • 3.0 Elevator $ -
  • 4.0 Built-in Equipment $ -
  • 5.0 Special Items (Identify) $ -
  • BUILDING MECHANICAL

1.0 Fire Suppression $ -

2.0 Plumbing $ -

3.0 Heating, Ventilation & Air Conditioning $ 395,967

1 Electric Power & Lighting $ 39,804

Communication $ -

c. BUILDING ELECTRICAL

General Site Work Subtotal: $ 3,900