Generated: 9/19/2025 9:14:38 AM
Copyright © 2025 University of Florida. All Rights Reserved.
| Vehicle Volumes and Adjustments |
| Approach | Eastbound | Westbound | Northbound | Southbound |
| Movement | U | L | T | R | U | L | T | R | U | L | T | R | U | L | T | R |
|---|
| Priority | | 10 | 11 | 12 | | 7 | 8 | 9 | 1U | 1 | 2 | 3 | 4U | 4 | 5 | 6 |
|---|
| Number of Lanes | | 0 | 1 | 0 | | 0 | 0 | 0 | 0 | 0 | 1 | 0 | 0 | 0 | 1 | 0 |
|---|
| Configuration | | | LR | | | | | | | LT | | | | | | TR |
|---|
| Volume (veh/h) | | 64 | | 31 | | | | | | 30 | 1026 | | | | 1003 | 58 |
|---|
| Percent Heavy Vehicles (%) | | 3 | | 3 | | | | | | 3 | | | | | | |
|---|
| Proportion Time Blocked | | | | | | | | | | | | | | | | |
|---|
| Percent Grade (%) | | 0 | | | |
|---|
| Right Turn Channelized | | | | | |
|---|
| Median Type | Storage | Undivided | |
|---|
| Critical and Follow-up Headways |
| Base Critical Headway (sec) | | 7.1 | | 6.2 | | | | | | 4.1 | | | | | | |
|---|
| Critical Headway (sec) | | 6.43 | | 6.23 | | | | | | 4.13 | | | | | | |
|---|
| Base Follow-Up Headway (sec) | | 3.5 | | 3.3 | | | | | | 2.2 | | | | | | |
|---|
| Follow-Up Headway (sec) | | 3.53 | | 3.33 | | | | | | 2.23 | | | | | | |
|---|
| Delay, Queue Length, and Level of Service |
| Flow Rate, v (veh/h) | | | 100 | | | | | | | 32 | | | | | | |
|---|
| Capacity, c (veh/h) | | | 56 | | | | | | | 622 | | | | | | |
|---|
| v/c Ratio | | | 1.77 | | | | | | | 0.05 | | | | | | |
|---|
| 95% Queue Length, Q95 (veh) | | | 9.4 | | | | | | | 0.2 | | | | | | |
|---|
| 95% Queue Length, Q95 (ft) | | | 240.6 | | | | | | | 5.1 | | | | | | |
|---|
| Control Delay (s/veh) | | | 527.2 | | | | | | | 11.1 | 1.4 | | | | | |
|---|
| Level of Service (LOS) | | | F | | | | | | | B | A | | | | | |
|---|
| Approach Delay (s/veh) | 527.2 | | | 1.7 | |
|---|
| Approach LOS | F | | | A | |
|---|
| General Information | Site Information |
| Analyst | STK | Intersection | PTNEY LANE & SO COOKS BR |
|---|
| Agency/Co. | MRA | Jurisdiction | |
|---|
| Date Performed | 9/19/2025 | East/West Street | PITNEY |
|---|
| Analysis Year | 2035 | North/South Street | SO COOKS BR |
|---|
| Time Analyzed | AM | Peak Hour Factor | 0.95 |
|---|
| Intersection Orientation | North-South | Analysis Time Period (hrs) | 0.25 |
|---|
| Project Description | 25-173ANB-1 NOBUILD |
|---|
| Lanes |