| Project Details | |
| Work Type | Resurfacing |
|---|---|
| Phase | Design |
| Limits | Alt US 19 (Pinellas Avenue) from north of Meres Boulevard to Pasco County Line |
| Length | 2.58 miles |
| City | Tarpon Springs |
| County | Pinellas |
| Road | Alt US 19 (Pinellas Avenue SR 595) |
Contact Information
Design Manager
Digvijay Patil
813-975-6176
Digvijay.Patil@dot.state.fl.us
Media Contact
Kayla Mejia 813-975-6060
Kayla.Mejia@dot.state.fl.us
The purpose of this project is to preserve and extend the life of the existing pavement through milling and resurfacing along this section of Alternate US 19 (Pinellas Avenue) in Pinellas County.
In addition to resurfacing, this project also includes ADA facility upgrades, as well as signage and pavement marking improvements.
Other work includes minor drainage upgrades and safety improvements.
Construction is currently anticipated to begin in 2028.