Grants - Limits
- Grants request must not exceed 25% of the eligible project costs
- –Renewable Energy:
- Minimum grant request $2,500
- Maximum grant request: $500,000
- If request is over $50,000, regulation requires a project-specific feasibility study prepared by a qualified independent consultant
- –Energy Efficiency:
- Minimum grant request $1,500
- Maximum grant request: $250,000
- If total project costs are over $50,000, regulation requires an energy audit. Less than $50,000, an Energy Assessment is required.