Grants - Limits

  • Grants request must not exceed 25% of the eligible project costs
  • Renewable Energy:
  • Minimum grant request $2,500
  • Maximum grant request: $500,000
  • If request is over $50,000, regulation requires a project-specific feasibility study prepared by a qualified independent consultant
  • Energy Efficiency:
  • Minimum grant request $1,500
  • Maximum grant request: $250,000
  • If total project costs are over $50,000, regulation requires an energy audit. Less than $50,000, an Energy Assessment is required.