Grants - Limits
Grants request must not exceed 25% of the eligible project costs
Renewable Energy:
Minimum grant request $2,500
Maximum grant request: $500,000
If request is over $50,000, regulation requires a project-specific feasibility study prepared by a qualified independent consultant
Energy Efficiency:
Minimum grant request $1,500
Maximum grant request: $250,000
If total project costs are over $50,000, regulation requires an energy audit. Less than $50,000, an Energy Assessment is required.