2014-2016 Kentucky Branch Budget Capital Budget Request: Capital Project Record All dollar amounts rounded to next $1000
Capital Budget Record CBR-02
Branch:Executive Branch
Cabinet:Postsecondary Education
Agency:Postsecondary Education Institutions
Appropriation:Kentucky State University
Project Title:E2 Replace Alumni House
KBUD Project Number:435U14C247
PriorityCapital Budget RequestSix-Year Capital Plan 2014-16
Cabinet:
Agency:2222
PROJECT DOCUMENTATION
Location (County): Franklin
Location (ADD): Bluegrass
Reauthorization - Regular Capital Project: Is this a currently authorized project which is being requested for reauthorization and/or additional funding? NO
If (Yes, Additional Funding), provide the following information: eMars Project Number (Agency, Fund): New Total Project Cost: $
Related to Previously Authorized Project: If the project is related to or a new phase of a project which was previously authorized please identify the project and action under which it was authorized.
Capital Project Type: New/Construction
Project Description
Additional/Description Justification The VFA Facility Condition and Space Study noted that based on life cycle assessment of building components, the facility is in need of a major renovation. The building could be impacted by the proposed realignment of Douglas and Langford Avenues. The building is owned by the Alumni Association and is used frequently for meetings and small conferences by various groups throughout the year. A more functional facility is desired by the Alumni. Site - Decision on site is pending completion of the Master Plan Update. Project Measurements - The new facility would be 3,000 GSF, and would be constructed as a modern conference/meeting and office facility. Prior Planning and/or Design - The University will work with the Alumni Association to further refine program needs.
Relationship to Other Prior Projects - If a new Business and Technology Conference Center (2010-2012) is authorized; consideration will be given to designating an area of the Center for alumni functions in lieu of building a new stand-alone Alumni facility.
Economic Development Impact - An attractive new, more functional facility could increase Alumni activity and funding.
Project Budget
Most of project budget was determined in-house and is based on similar projects recently undertaken by the University and on MS Means data.
Existing Facility
The Alumni House is a 2,905 GSF brick cottage built in 1961, and has not been renovated since construction. It contains a large lounge and is used for small conferences and meetings as well as for alumni functions. The two guest rooms are no longer used for lodging.
Program Relocation
Phased Project
Universities Only: Type of SpaceEducational and General
Proposed Heat/Air conditioning Fuel TypeElectric
Previous Request(s): Has this item been requested in a prior biennial budget request? Yes
If yes, identify the biennium/biennium; the project names(s); and the Cabinet/Agency.2012-2014
PROJECT BUDGET
Has this project been reviewed by the Department for Facilities and Support Services? No
Fund SourceRequested FY 2013-14Requested FY 2014-15Requested FY 2015-16
Restricted Funds01,241,0000
Total Funds01,241,0000
Cost Elements
78