2014-2016 Kentucky Branch Budget Capital Budget Request: Capital Project Record All dollar amounts rounded to next $1000
Capital Budget Record CBR-02
Branch: Executive Branch
Cabinet: Postsecondary Education
Agency: Postsecondary Education Institutions
Appropriation: Kentucky State University
Project Title: E1 Roof Repair & Replacement Pool 2014
KBUD Project Number: 435U14C235
Priority Capital Budget Six-Year Capital Plan
Request 2014-16
Cabinet:
Agency: 3 3
PROJECT DOCUMENTATION
Location (County): Franklin
Location (ADD): Bluegrass
Reauthorization - Regular Capital Project: Is this a currently authorized project which is being requested for reauthorization and/or
additional funding? NO
If (Yes, Additional Funding) , provide the following information:
eMars Project Number (Agency, Fund):
New Total Project Cost: $
Related to Previously Authorized Project: If the project is related to or a new phase of a project which was previously authorized
please identify the project and action under which it was authorized.
Capital Project Type: Multiple Project Pool
Project Description
Additional/Description Justification -Life Safety Issues, Government mandates, or Security Concerns - N/A
-Citation, Order, Agreement with State or Federal Courts or a Regulatory Agency - N/A
-Project Measurements -Exum Center is a 125,040 GSF Bell Gym is 34,466 GSF
-Site - Existing facilities on the main campus.
-Prior Planning and/or Design - Preliminary roof condition assessments were performed by consulting A/E to determine the scope of work.
-Relationship to Other Prior Projects(s) - N/A
-Economic Development Impact N/A
Project Budget
Project budget was based on current estimating practices for similar project types utilizing square foot costs and maintenance cost standards. Budget cost of $15 per sq. ft. of flat roof.
Existing Facility
Exum Center is a 125,040 GSF Physical Education facility built 1994 and includes offices, classrooms, swim pool, fitness center, racquetball courts, lockers and gym. The facility is in very good condition with the exception in of the roof.
Program Relocation
Phased Project
Universities Only: Type of Space Educational and General
Proposed Heat/Air conditioning Fuel Type Other
Previous Request(s): Has this item been requested in a prior biennial budget request? Yes
If yes, identify the biennium/biennium; the project names(s); and the Cabinet/Agency. 2004-2006
PROJECT BUDGET
Has this project been reviewed by the Department for Facilities and Support Services? No
Fund Source Requested Requested Requested
FY 2013-14 FY 2014-15 FY 2015-16
Total
42