41
2020-2022 Kentucky Branch Budget Capital Budget Request: Capital Construction Project Record All dollar amounts rounded to next $1000
Capital Budget Record CBR-02 Branch: Executive Branch Cabinet: Postsecondary Education Agency: Postsecondary Education Institutions Appropriation: Kentucky State University Project Title: Academic & Student Success Center
KBUD Project Number: 435U20C005
PriorityCapital Budget RequestSix-Year Capital Plan 2020-22
Cabinet:
Agency:3
PROJECT DOCUMENTATION
Location (County): Franklin
Reauthorization - Regular Capital Project: Is this a currently authorized project which is being requested for reauthorization and/or additional funding? NO
If (Yes, Additional Funding), provide the following information:
eMars Project Number (Agency, Fund):
New Total Project Cost: $ 29,604,000
Capital Project Type:
Project Description
The purpose of this project is to renovate the Blazer Library in order to provide a technology-rich learning center that has: Lecture and Event Spaces, Collaboration or Individual Learning Spaces, Writing and Communication Center, Maximize Space and Workflow, and Access to Technology. Paul G. Blazer Library was last renovation and addition was in 1988. It needs a full renovation to a facility where KSU students can enhance their academic and learning experience. It needs to be an academic and student success center as well as a repository of written knowledge. KSU is currently working with an architectural design firm to prepare road map of how Paul G. Blazer Library can be fully renovated and achieve the needs of our students. That Pre-Design effort is titled “Renovations in Blazer Library”. This project will provide various improvements to the Blazer Library including an upgrade in the HVAC, partial roof replacement, special fire protection for the Library's Special Collections and Archives areas; replacement of the facility's security system; and window replacements in the older section of the facility. The project will also include a state-of-the-art electrical information access and retrieval system.
PROJECT BUDGET
Has this project been reviewed by the Department for Facilities and Support Services?
Fund SourceRequested FY 2019-20Requested FY 2020-21Requested FY 2021-22Requested Total
Bond Funds029,604,000029,604,000
Total Funds029,604,000029,604,000
Cost Elements
Project Design02,240,00002,240,000
Movable Equipment/Furniture0897,0000897,000
Contingency Expense03,745,00003,745,000
Construction Costs022,722,000022,722,000
Total Costs029,604,000029,604,000
Completion Date: 09 / 2022
IMPACT ON OPERATING BUDGETFY1 AmountFY2 AmountFY3 AmountFY4 AmountFY5 Amount
Fund Source
00000
Total Costs00000
Cost Element
00000
Total Expenditures00000