2025-26 Pool ProjectsORIGINAL Asset Preservation Pool AllocationPROPOSED Asset Preservation AllocationIncrease/(Decrease) from this Pool for BOR Approval 8.7.26Total Project when combined with other Pool and Grant FundsStatus 7.15.26Updated Scope/Change Request
KSU - Carver Hall Renovation Phase 1$ 6,000,000$-$(6,000,000)$ 22,500,000This will become a larger project in 27-28Request to move these funds to the Student Center Interior Renovation
KSU - Shauntee Hall Renovation$ 5,000,000$ 5,000,000$-$ 15,680,000Bids RequestedThis project also includes $3M from Title III Funds that the BOR Approved on 6.12.26
KSU - Design Health Sciences Center HB 6 $5,000,000$ 5,000,000$ 5,000,000$-$ 5,000,000Final design approved by BORNone
KSU - Site Improvements Phase 2 & 3 - Walks & Paving$ 2,000,000$ 1,795,706$ (204,294)$ 3,124,706Bids RequestedRequesting to move $204,294 to Contingency
KSU - Building Evaluation & Asset Preservation (HVAC)$ 250,000$ 250,000$-$ 250,000Holding for Chiller Replacement ProjectRequest transfer $250,000 to new Emergency Chiller Replacement Project.
KSU - Kentucky Hall Renovation - D 25 C 26$ 15,000,000$ 16,500,000$ 1,500,000$ 17,200,000In DesignProject will Renovate Kentucky Hall
KSU - Hill Student Center - HVAC$ 1,500,000$ 6,000,000$ 4,500,000$ 6,499,250Creating new Project from 2026-27 Asset Preservation PoolRequest to move funds to Kentucky Hall and Carver to Renovate the 1st Floor and Ballroom.
Contingency$ 250,000$ 454,294$ 204,294$ 454,294Request increase in contingency
Total$ 35,000,000$ 35,000,000$-