Capital Project and Asset Preservation Pool Changes as of 8.7.26

2022-24 Pool ProjectsORIGINAL Asset Preservation Pool AllocationPROPOSED Asset Preservation Pool AllocationIncrease/(Decrease) from this Pool for BOR Approval 8.7.26Total Project when combined with other Pool and Grant FundsStatus 7.15.26Updated Scope/Change Request
KSU - Chandler Hall Renovation$ 970,000$ 970,000$ -$ 9,970,000Near CompletionNone
KSU - Hunter Hall Renovation$ 750,000$ 750,000$ -$ 8,250,000Initial Design Complete - See 2024-25None
KSU - Elevator Repairs, Modernization$ 500,000$ 500,000$ -$ 500,000The original project was higher than the budget. DECA rescoping the projectNone
KSU - Hume Hall$ 807,000$ 821,000$ 14,000$ 821,000Work CompleteNone
KSU - MEP Deficiencies$ 500,000$ 500,000$ -$ 500,000Work CompleteNone
KSU - Dorm Renovations Study$ 800,000$ 800,000$ -$ 800,000Ongoing, per dormNone
KSU - Combs Hall Renovation$ 8,200,000$ 8,200,000$ -$ 8,200,000Laundry Room drain issue TBDNone
KSU - McCullin Hall Renovation$ 500,000$ 500,000$ -$ 2,000,000Design CompleteNone
KSU - Bradford Hall Renovation$ 1,800,000$ 2,206,000$ 406,000$ 2,206,000Work Nearly CompleteRequest to increase $406,000 to replace deteriorated window lintels.
KSU - Site Improvements Phase 2 & 3 - Walks & Paving$ 750,000$ 329,000$ (421,000)$ 3,124,706Combining $329,000 with future allocations.Request to move $406,000 to Bradford (Windows), $1,000 to Exum (Permits), $14,000 to Hume (Skylight).
KSU - The Halls Renovation Phase I$ 500,000$ 750$ (499,250)$ 750Spent $750Request to Reallocate $499,250 to Student Center Interior Renovation
KSU - Various Demolition Projects$ 650,000$ 341,384$ (308,616)$ 341,384Spent $341,384Request to transfer the balance of $308,616 to Exum