SR 682 (Pinellas Bayway) New Traffic Signal at Dolphin Cay Lane/Landings Drive in Pinellas County 254677-6-41
| Project Details | |
| Work Type | Safety Improvements |
|---|---|
| Phase | Construction |
| Limits | at Dolphin Cay Lane/Landings Drive |
| Project Start | July 13, 2026 |
| City | St. Petersburg |
| County | Pinellas |
| Road | SR 682 |
| Construction Cost | $1.6 million |
| Estimated Completion | Early 2027 |
| Contractor | Cone & Graham, Inc. |
Project Information Maddie Griffin
727-575-8334
Maddie.Griffin@dot.state.fl.us
Kayla Mejia
813-975-6060
Kayla.Mejia@dot.state.fl.us
The Florida Department of Transportation's Design-Build Firm, Cone & Graham, Inc., is adding a new traffic signal on SR 682 (Pinellas Bayway) at Dolphin Cay Lane/Landings Drive in Pinellas County.
Other safety and operational improvements include road resurfacing, and pedestrian and lighting improvements.
Construction activities are underway and expected to be complete in early 2027.
***** *****
What is design-build? Design-build is a method of project delivery in which one entity - the design-build team - works under a single contract with the FDOT (or any owner) to fully design and construct a project. The contract work covers from initial design through construction completion. This contract type typically allows for faster construction of a project as design and construction can be on-going simultaneously.
For more information on this project, or to sign-up to receive construction updates and traffic alerts, please visit FDOTtampabay.com (Project Number: 254677-6-41) Last Updated: 11/03/2026