KENTUCKY STATE UNIVERSITY BOARD OF REGENTS

  • Demolition of vacant and blighted property owned by KSU (The project estimate includes environmental assessments, abatement, development of bid documents, and the demolition for all 3 sites):1. Russell Court Apartments2. Burned house on the entrance of campus at College Street & Douglas Avenue3. Car wash on East Main. $500,000
  • Campus wide Elevator Repairs, Modernization, and Emergency Call Services (consultation to assess, recommend, and prioritize project management) $500,000
  • Residence Hall Interior and Exterior Renovations• Architectural Design and Improvement Process. October 2023 Specific Budgets and Project Scope details to be defined. $800,000
  • The Halls Residence Facility (Formerly Old Young Hall)• HVAC and related air quality improvements(The scope of the project includes piping main replacement and modification in the boiler room to support the removal and replacement of existing mechanical equipment) $500,000
  • Walkway Improvements and Safety/ADA Related Upgrades & Repairs• This project will address necessary safety repairs to walkways and associated railings, as well as other emergent concrete repairs. $500,000
  • Jackson Hall Renovations• Grant specific work to the buildings ornate roofing structure that is deteriorating and becoming a safety hazard. This project will be supplemented by Asset Preservation Funds to make other necessary renovations and repairs to the building's interior to bring it back online. $1.5 MIL($500K - Historic Preservation Grant & possible Title III)
  • William Exum Health & Physical Education Center Renovations• Design Phase ($800K). October 2023 Specific Budgets and Project Scope details to be defined. Estimated cost $650K. This will be a change order to the existing roof contract. Project specific scope of work.• Cleaning of all EIFS (Exterior Envelope/Siding. Full depth EIFS replacement to match existing EIFS. ARM has included an allowance of 1,500 SF of EIFS replacement.• Replacement of control joints, window perimeter, & louver perimeter sealant joints at EIFS areas directly referenced on the drawings.• Installation of (2) coats of elastomeric coating to all EIFS areas directly referenced on the drawings. $1.363 MIL
  • Bell Gym Stair (Egress) Replacement• Reinstall the exterior stair system that was removed from the building's exterior. This will $150,000
  • Reinstall the exterior stair system that was removed from the building's exterior. This will restore safety exits and allow for a greater occupancy use of the building.