===== PAGE 1 ===== # South Lake Trail Phase IIIB SR 50, Eagles Crossing Road, and CR 565A ## Proposed Shared Use Path Typical Section Minimum Separation to Curbed Roadway
Image
TYPICAL SECTION NO. 1 STA 9+20.37 TO STA 11+00 STA 15+50.00 TO STA 21+50.00 STA 29+08.91 TO STA 31+25.00 STA 42+25.00 TO STA 44+75.00 (NOT TO SCALE) Proposed Shared Use Path Typical Section Minimum Separation to Curbed Roadway and Reduced Path Width
Image
TYPICAL SECTION NO. 3 STA 24+16.70 TO STA 27+25.00 STA 28+86.00 TO STA 29+08.91 (NOT TO SCALE) ===== PAGE 2 ===== ## South Lake Trail Phase IIIB SR 50, Eagles Crossing Road, and CR 565A
Proposed Shared Use Path Typical Section Increased Separation to Curbed Roadway
### TYPICAL SECTION NO. 2 Existing 5' Sidewalk to be Removed STA 11+00 TO STA 15+50.00 STA 21+50.00 TO STA 24+16.70 STA 31+25.00 TO STA 42+25.00 STA 44+75.00 TO STA 46+90.00 (NOT TO SCALE)
Image
Image
### TYPICAL SECTION NO. 4
Typical Sections