===== PAGE 1 =====
# South Lake Trail Phase IIIB SR 50, Eagles Crossing Road, and CR 565A
## Proposed Shared Use Path Typical Section Minimum Separation to Curbed Roadway
TYPICAL SECTION NO. 1
STA 9+20.37 TO STA 11+00
STA 15+50.00 TO STA 21+50.00
STA 29+08.91 TO STA 31+25.00
STA 42+25.00 TO STA 44+75.00
(NOT TO SCALE)
Proposed Shared Use Path Typical Section
Minimum Separation to Curbed Roadway and Reduced Path Width
TYPICAL SECTION NO. 3
STA 24+16.70 TO STA 27+25.00
STA 28+86.00 TO STA 29+08.91
(NOT TO SCALE)
===== PAGE 2 =====
## South Lake Trail Phase IIIB SR 50, Eagles Crossing Road, and CR 565A
Proposed Shared Use Path Typical Section Increased Separation to Curbed Roadway
### TYPICAL SECTION NO. 2
Existing 5'
Sidewalk to be
Removed
STA 11+00 TO STA 15+50.00
STA 21+50.00 TO STA 24+16.70
STA 31+25.00 TO STA 42+25.00
STA 44+75.00 TO STA 46+90.00
(NOT TO SCALE)
### TYPICAL SECTION NO. 4
Typical Sections