205

Boundary Stage:

Year Month Day Hour Stage [ft]

0 0 0 0.0000 49.00

0 0 0 999.0000 49.00

Comment:

Scenario:PD&E
Type:Time/Stage
Base Flow:0.00 cfs
Initial Stage:54.00 ft
Warning Stage:54.00 ft
Boundary Stage:

Year Month Day Hour Stage [ft]

0 0 0 0.0000 54.00

0 0 0 999.0000 54.00

Comment:

Pipe Link: CD-5UpstreamDownstream
Scenario:ExistingInvert:40.33 ftInvert:40.29 ft
From Node:501Manning's N:0.0120Manning's N:0.0120
To Node:Peace River Trib2Geometry: Horizontal EllipseGeometry: Horizontal Ellipse
Link Count:1Max Depth:1.92 ftMax Depth:1.92 ft
Flow Direction:BothBottom Clip
Damping:0.0000 ftDefault:0.00 ftDefault:0.00 ft
Length:69.42 ftOp Table:Op Table:
FHWA Code:2Ref Node:Ref Node:
Entr Loss Coef:0.50Manning's N:0.0000Manning's N:0.0000
Exit Loss Coef:0.00Top Clip
Bend Loss Coef:0.00Default:0.00 ftDefault:0.00 ft
Bend Location:0.00 decOp Table:Op Table:
Energy Switch:EnergyRef Node:Ref Node:
Manning's N:0.0000Manning's N:0.0000

Comment: Pipe size, material, and inverts are updated based on SR 70 survey (APR2022)

Pipe Link: CD-6 Upstream Downstream

Scenario: Existing From Node: 601 Invert: 46.45 ft Manning's N: 0.0120 Invert: 47.05 ft Manning's N: 0.0120