Along SR 72, there are four existing cross drains which convey flow from the north side of SR 72 to the south side, towards the Peace River.
EX-0: 8-ft high x 8-ft wide concrete box culvert is located approximately 1200 feet south of the begin project limits
EX-1: 4-ft high x 5-ft wide concrete box culvert is located 2500 feet northeast of the begin project limits
EX-2: 30-inch reinforced concrete pipe located 1000 feet southwest of the SR 70 and SR 72 intersection
EX-3: double 24-inch reinforced concrete pipe located 130 feet southwest of the SR 70 and SR 72 intersection
The Balmoral Group performed field visits on December 15, 2017, January 4, 2018, and, January 9, 2018 to review the existing conditions. In general, there did not appear to be any structural deficiencies or erosion at the existing cross drains.
Figure 4- EX-0 (Existing 8'x 8' CBC) (12/18/2017)
Page | 8