Location Hydraulic Report March 2026
Figure 3 - Proposed Typical Section of SR
SR 70 TYPICAL SECTION
b. Cross Drain Design Considerations
Table 1 provides the required storm events to be analyzed for each cross drain, per the FDOT Drainage Manual and Culvert Handbook requirements.
Table 1 – Storm Frequency Criteria
Storm Event FrequencyReason
10-yearGeneral Roadside Ditch Culverts
25-yearDesign Flood Event (20-year project of AADT < 1,500)
50-year*Design Flood Event (20-year projection of AADT > 1,500)
100-yearBase Flood Event
500-yearGreatest Flood Event
* This is the design storm for this project.
Per the FDOT Drainage Manual, the rainfall depths utilized for the modeling were based on the NOAA Atlas 14 Point Precipitation Frequency Estimates at Arcadia, Florida. For the purposes of the location hydraulic analysis, only the 24-hour duration was reviewed.
Page | 6