## TENTATIVE WORK PROGRAM PUBLIC HEARING REPORT
Image
FISCAL YEAR 2026 TO FISCAL YEAR 2030
Image
Image
SARASOTA COUNTY DETAIL REPORT AS OF 11/14/2024 9:15 PM SUBJECT TO CHANGE FLORIDA DEPARTMENT OF TRANSPORTATION DISTRICT 1 PROJECTS FUNDED JULY 1, 2025 TO JUNE 30, 2030 VISIT US AT WWW.FDOT.GOV/WPPH/DISTRICT1 ===== PAGE 2 ===== ## SARASOTA COUNTY ## 201277 -5 - I-75 (SR 93) AT BEE RIDGE ROAD Type of Work: INTERCHANGE - ADD LANES
PhaseFund Code20262027202820292030
Preliminary EngineeringLF$280,000
Right of WayBNIR$4,899,996
EnvironmentalACNP$200,000
Total for Project 201277-5$4,899,996$280,000$200,000
## 201277 -8 - I-75 (SR 93) AT CLARK RD (SR 72) INTERCHANGE Type of Work: LANDSCAPING
PhaseFund Code20262027202820292030
ConstructionDDR$1,695,146
DIH$10,300
Total for Project 201277-8$1,705,446
## 201277 -9 - I-75 AT SR 681 INTERCHANGE IMPROVEMENTS Type of Work: PD&E/EMO STUDY
PhaseFund Code20262027202820292030
PD & EACNP$2,501,000
Total for Project 201277-9$2,501,000
## 412676 -1 - SARASOTA COUNTY TSMCA Type of Work: TRAFFIC CONTROL DEVICES/SYSTEM
PhaseFund Code20262027202820292030
OperationsDDR$545,139$83,413
DITS$181,333$755,350
Total for Project 412676-1$726,472$755,350$83,413
## 413657 -1 - TOWN OF LONGBOAT KEY TSMCA Type of Work: TRAFFIC CONTROL DEVICES/SYSTEM
PhaseFund Code20262027202820292030
OperationsDDR$23,468$24,554$25,707
Total for Project 413657-1$23,468$24,554$25,707
## 413658 -1 - CITY OF NORTH PORT TSMCA Type of Work: TRAFFIC CONTROL DEVICES/SYSTEM
PhaseFund Code20262027202820292030
OperationsDDR$72,143$75,480$79,019
Total for Project 413658-1$72,143$75,480$79,019
===== PAGE 3 ===== ## SARASOTA COUNTY ## 413659 -1 - CITY OF SARASOTA TSMCA Type of Work: TRAFFIC CONTROL DEVICES/SYSTEM
PhaseFund Code20262027202820292030
OperationsDDR$281,868$33,900
DITS$294,836
Total for Project 413659-1$281,868$294,836$33,900
## 413660 -1 - CITY OF VENICE TSMCA Type of Work: TRAFFIC CONTROL DEVICES/SYSTEM
PhaseFund Code20262027202820292030
OperationsDDR$63,734$66,248$68,905
Total for Project 413660-1$63,734$66,248$68,905
## 420613 -2 - I-75 (SR 93) AT FRUITVILLE ROAD/CR 780 Type of Work: INTERCHANGE - ADD LANES
PhaseFund Code20262027202820292030
EnvironmentalDDR$30,252
Design BuildDIH$5,310
Total for Project 420613-2$30,252$5,310
## 436680 -2 - SR 789 (RINGLING) FROM BIRD KEY DRIVE TO SARASOTA HARBOR WEST Type of Work: BRIDGE REPLACEMENT
PhaseFund Code20262027202820292030
ConstructionACBR$66,866,262
Total for Project 436680-2$66,866,262
## 444634 -2 - SR 72 FROM EAST OF I-75 TO EAST OF IBIS Type of Work: ADD LANES & RECONSTRUCT
PhaseFund Code20262027202820292030
Preliminary EngineeringACSU$2,301,000
Total for Project 444634-2$2,301,000
## 445059 -1 - RIVER RD FROM US 41 TO I-75 Type of Work: ADD LANES & RECONSTRUCT
PhaseFund Code20262027202820292030
RepaymentDDR$12,972,437$7,667,050
Total for Project 445059-1$12,972,437$7,667,050
===== PAGE 4 ===== ## SARASOTA COUNTY
445409-2 - SR 45 (US 41) SB OVER SOUTH CREEK BRIDGE REPLACEMENT BRIDGE # 170014
Type of Work: BRIDGE REPLACEMENT
PhaseFund Code20262027202820292030
Preliminary EngineeringACBR$780,000
Total for Project 445409-2$780,000
## 446680 -2 - PINEBROOK RD FROM S OF E VENCIE AVE TO N OF RIDGEWOOD AVE Type of Work: MISCELLANEOUS CONSTRUCTION
PhaseFund Code20262027202820292030
ConstructionCIGP$500,000
LF$500,000
Total for Project 446680-2$1,000,000
## 447255 -1 - INKWOOD DR OVER LITTLE FIELD WATERWAY BRIDGE #175030 Type of Work: BRIDGE REPLACEMENT
PhaseFund Code20262027202820292030
ConstructionGFBR$2,459,117
LF$734,648
SA$21,240
Total for Project 447255-1$3,215,005
## 447882 -1 - SR 776 FROM CHARLOTTE COUNTY LINE TO TANGERINE WOODS BLVD
Type of Work: MEDIAN MODIFICATION
PhaseFund Code20262027202820292030
ConstructionACSS$792,242
SU$1,087,304
EnvironmentalTALT$150,000
Total for Project 447882-1$2,029,546
## 447887 -1 - SR 72 FROM SWIFT RD TO SAWYER RD Type of Work: MEDIAN MODIFICATION
PhaseFund Code20262027202820292030
ConstructionACSS$1,801,448
SU$1,500,430
Total for Project 447887-1$3,301,878
===== PAGE 5 ===== ## SARASOTA COUNTY ## 448070 -1 - CIRCUS DRAWBRIDGE REHABILITATION BRIDGE #S 170167 & 170168 Type of Work: BRIDGE-REPAIR/REHABILITATION
PhaseFund Code20262027202820292030
Preliminary EngineeringBRRP$489,025
ConstructionBRRP$4,048,613
DIH$1,096
Total for Project 448070-1$489,025$4,049,709
## 449122 -1 - SR 72 FROM US 41 (SR 45) TO E OF DEREK AVE Type of Work: RESURFACING
PhaseFund Code20262027202820292030
ConstructionACNR$2,707,946
ACPR$10,108,632
SA$1,338,573
SU$300,431
Total for Project 449122-1$14,455,582
## 449122 -2 - SR 72 FROM E OF DEREK AVE TO E OF HONORE AVE Type of Work: FLEXIBLE PAVEMENT RECONSTRUCT.
PhaseFund Code20262027202820292030
Right of WayDIH$156,000
DS$1,444,000
Total for Project 449122-2$1,600,000
## 449188 -1 - I-75 (SR 93) FROM SR 681 TO SR 780 Type of Work: RESURFACING
PhaseFund Code20262027202820292030
Preliminary EngineeringACNP$2,001,000
ConstructionACNP$35,813,413
Total for Project 449188-1$2,001,000$35,813,413
## 450843 -2 - FRUITVILLE RD FROM LORRAINE RD TO BOURNESIDE RD Type of Work: ADD LANES & RECONSTRUCT
PhaseFund Code20262027202820292030
Preliminary EngineeringCD24$4,000,000
Total for Project 450843-2$4,000,000
===== PAGE 6 ===== ## SARASOTA COUNTY
451010-1 - SR 45 (US 41) FROM N OF 14TH STREET TO S OF DR MLK JR WAY Type of Work: PAVEMENT ONLY RESURFACE (FLEX)
PhaseFund Code20262027202820292030
ConstructionDIH$5,480
DS$1,535,168
Total for Project 451010-1$1,540,648
## 451011 -2 - SR 45 (US 41) FROM N OF MYRTLE ST TO S OF GENERAL SPAATZ BLVD
Type of Work: SAFETY PROJECT
PhaseFund Code20262027202820292030
ConstructionACSS$10,300
Total for Project 451011-2$10,300
451011-3 - SR 45 (US 41) FROM N OF MYRTLE ST TO S OF GENERAL SPAATZ BLVD Type of Work: PAVEMENT ONLY RESURFACE (FLEX)
PhaseFund Code20262027202820292030
ConstructionDDR$306,083
DIH$5,150
DS$3,956,669
Total for Project 451011-3$4,267,902
## 451011 -4 - SR 45 (US 41) FROM N OF MYRTLE ST TO S OF GENERAL SPAATZ BLVD
Type of Work: SAFETY PROJECT
PhaseFund Code20262027202820292030
ConstructionACSS$488,096
SU$498,396
Total for Project 451011-4$986,492
## 451013 -1 - SR 789 FROM LONGBOAT CLUB RD TO MANATEE CO LINE Type of Work: PAVEMENT ONLY RESURFACE (FLEX)
PhaseFund Code20262027202820292030
ConstructionDDR$5,155,601
DIH$5,150
Total for Project 451013-1$5,150$5,155,601
## 451014 -1 - SR 776 FROM CHARLOTTE CO LINE TO S OF US 41 Type of Work: PAVEMENT ONLY RESURFACE (FLEX)
PhaseFund Code20262027202820292030
ConstructionDDR$18,691,101
DIH$51,500
Total for Project 451014-1$18,742,601
===== PAGE 7 ===== ## SARASOTA COUNTY
451017-1 - SR 683 (US 301) FROM US 41 TO S OF 10TH ST Type of Work: RESURFACING
PhaseFund Code20262027202820292030
ConstructionACNR$7,453,535
DIH$5,150
SA$854,201
SU$453,453
Total for Project 451017-1$8,766,339
## 451280-1 - SR 758 OVER SARASOTA BAY BRIDGE NO 170061 Type of Work: BRIDGE-REPAIR/REHABILITATION
PhaseFund Code20262027202820292030
ConstructionBRRP$4,181,425
DIH$10,300
Total for Project 451280-1$4,191,725
## 451389 -1 - BEACH RD FROM AVENIDA DEL MARE TO MIDNIGHT PASS RD Type of Work: PUBLIC TRANSPORTATION SHELTER
PhaseFund Code20262027202820292030
ConstructionLF$120,000
SU$26,161
TALU$449,839
Total for Project 451389-1$596,000
## 451734 -1 - I-75 (SR 93) FROM SR 777 TO SR 681 Type of Work: RESURFACING
PhaseFund Code20262027202820292030
Design BuildACNP$40,053,629
Total for Project 451734-1$40,053,629
## 452172 -1 - SARASOTA COUNTY SUBMARINE CABLE REPLACEMENT Type of Work: BRIDGE-REPAIR/REHABILITATION
PhaseFund Code20262027202820292030
Preliminary EngineeringBRRP$474,762
ConstructionBRRP$4,433,679
Total for Project 452172-1$474,762$4,433,679
===== PAGE 8 ===== ## SARASOTA COUNTY 452784-1 - SR 45 (US 41/US 41B) FROM S OF SR 758 (BEE RIDGE RD) TO S OF SR 683 Type of Work: RESURFACING
PhaseFund Code20262027202820292030
Preliminary EngineeringDIH$1,000
DS$1,301,000
ConstructionACNR$11,266,925
ACSS$570,591
DIH$5,480
DS$1,674,765
Total for Project 452784-1$1,302,000$13,517,761
453226-1 - SR 777 RIVER RD FROM US 41 (SR 45) TO OBSERVATION BLVD Type of Work: LANDSCAPING
PhaseFund Code20262027202820292030
ConstructionDDR$1,365,763
DIH$1,030
DS$240,611
Total for Project 453226-1$1,030$1,606,374
453537-1 - US41/S TAMIAMI TRAIL FROM SIESTA DR TO SR683/US301 ATSPM/CV UPGRADE Type of Work: ATMS - ARTERIAL TRAFFIC MGMT
PhaseFund Code20262027202820292030
ConstructionSU$2,285,839
Total for Project 453537-1$2,285,839
## 453538 -1 - US 41 (SR 45) GULF GATE DR TO BEE RIDGE RD ATSPM/CV UPGRADE Type of Work: ATMS - ARTERIAL TRAFFIC MGMT
PhaseFund Code20262027202820292030
ConstructionSU$3,699,594
Total for Project 453538-1$3,699,594
## 453539 -1 - SR 780/FRUITVILLE RD FROM US 301 TO HONORE AVENUE ATSPM CV UPGRADE Type of Work: ATMS - ARTERIAL TRAFFIC MGMT
PhaseFund Code20262027202820292030
ConstructionSU$4,783,162
Total for Project 453539-1$4,783,162
## 454945 -1 - WINCHESTER BLVD FROM CHARLOTTE COUNTY LINE TO S RIVER RD Type of Work: ADD LANES & RECONSTRUCT
PhaseFund Code20262027202820292030
ConstructionCD23$1,000,000
Total for Project 454945-1$1,000,000
===== PAGE 9 ===== ## SARASOTA COUNTY
455147-1 - MANASOTA KEY BASCULE BRIDGE - REHABILITATION AND STORM HARDENING
Type of Work: BRIDGE-REPAIR/REHABILITATION
PhaseFund Code20262027202820292030
ConstructionPROD$6,030,000
Total for Project 455147-1$6,030,000
## 455186 -1 - SR45(US41) FROM SR776 TO NORTH OF CENTER RD Type of Work: SAFETY PROJECT
PhaseFund Code20262027202820292030
Preliminary EngineeringACSS$510,000
Total for Project 455186-1$510,000
## 455381 -1 - I-75 AT SR 681 INTERCHANGE IMPROVEMENTS Type of Work: INTERCHANGE - ADD LANES
PhaseFund Code20262027202820292030
Preliminary EngineeringACNP$3,010,000
Total for Project 455381-1$3,010,000
## 456038 -1 - SR 681 FROM SOUTH OF ISLA PALMA LANE TO SOUTH OF I-75 Type of Work: PAVEMENT ONLY RESURFACE (FLEX)
PhaseFund Code20262027202820292030
ConstructionFC5$329,242
Total for Project 456038-1$329,242
## 456039 -1 - I-75(SR93) FROM NORTH OF BEE RIDGE ROAD TO SOUTH OF FRUITVILLE ROAD Type of Work: PAVEMENT ONLY RESURFACE (FLEX)
PhaseFund Code20262027202820292030
ConstructionFC5$61,072
Total for Project 456039-1$61,072
===== PAGE 10 ===== ## SARASOTA COUNTY ## 412584 -1 - SARASOTA COUNTY HIGHWAY LIGHTING Type of Work: ROUTINE MAINTENANCE
PhaseFund Code20262027202820292030
Bridge/Roadway/Contract MaintenanceD$665,548$685,521
Total for Project 412584-1$665,548$685,521
## 413565 -1 - NORTH PORT HIGHWAY LIGHTING Type of Work: ROUTINE MAINTENANCE
PhaseFund Code20262027202820292030
Bridge/Roadway/Contract MaintenanceD$121,640$125,290
Total for Project 413565-1$121,640$125,290
## 413566 -1 - SARASOTA CITY HIGHWAY LIGHTING Type of Work: ROUTINE MAINTENANCE
PhaseFund Code20262027202820292030
Bridge/Roadway/Contract MaintenanceD$351,404$361,949
Total for Project 413566-1$351,404$361,949
## 413567 -1 - VENICE HIGHWAY LIGHTING Type of Work: ROUTINE MAINTENANCE
PhaseFund Code20262027202820292030
Bridge/Roadway/Contract MaintenanceD$118,352$121,904
Total for Project 413567-1$118,352$121,904
## 413807 -1 - LONGBOAT KEY HIGHWAY LIGHTING Type of Work: ROUTINE MAINTENANCE
PhaseFund Code20262027202820292030
Bridge/Roadway/Contract MaintenanceD$57,715$59,447
Total for Project 413807-1$57,715$59,447
## 448729 -1 - SARASOTA ASSET MAINTENANCE Type of Work: ROUTINE MAINTENANCE
PhaseFund Code20262027202820292030
Bridge/Roadway/Contract MaintenanceD$2,698,974$2,698,974$2,698,974$1,349,487
Total for Project 448729-1$2,698,974$2,698,974$2,698,974$1,349,487
===== PAGE 11 ===== ## SARASOTA COUNTY 455928-1 - BENEVA RD TO BOBBY JONES GOLF CLUB / CIRCUS BLVD Type of Work: BIKE PATH/TRAIL
PhaseFund Code20262027202820292030
Preliminary EngineeringTLWR$550,000
Total for Project 455928-1$550,000
===== PAGE 12 ===== ## SARASOTA COUNTY
438750-1 - VENICE MUNICIPAL AIRPORT
Type of Work: AVIATION PRESERVATION PROJECT
PhaseFund Code20262027202820292030
CapitalDPTO$500,000
LF$125,000
Total for Project 438750-1$625,000
## 444676-1 - SARASOTA-BRADENTON INT'L ARPT EMERGENCY OPERATIONS CENTER Type of Work: AVIATION REVENUE/OPERATIONAL
PhaseFund Code20262027202820292030
CapitalDPTO$675,000
LF$675,000
Total for Project 444676-1$1,350,000
## 444679-1 - SARASOTA-BRADENTON INT'L ARPT RUNWAY 14-32 REHAB W/ PAVED SHOULDERS Type of Work: AVIATION PRESERVATION PROJECT
PhaseFund Code20262027202820292030
CapitalDPTO$700,000
FAA$12,600,000
LF$700,000
Total for Project 444679-1$14,000,000
## 446357 -1 - SARASOTA-BRADENTON INT'L ARPT BAGGAGE HANDLING SYSTEM
Type of Work: AVIATION PRESERVATION PROJECT
PhaseFund Code20262027202820292030
CapitalDDR$1,000,000
DPTO$2,000,000
LF$2,000,000$1,000,000
Total for Project 446357-1$4,000,000$2,000,000
## 450206 -1 - VENICE MUNICIPAL AIRPORT REHABILITATE TAXILANES Type of Work: AVIATION PRESERVATION PROJECT
PhaseFund Code20262027202820292030
CapitalDPTO$2,166,000
LF$541,500
Total for Project 450206-1$2,707,500
===== PAGE 13 ===== ## SARASOTA COUNTY
450301-1 - SARASOTA-BRADENTON AIRPORT LAND ACQUISITION PROJECT Type of Work: AVIATION ENVIRONMENTAL PROJECT
PhaseFund Code20262027202820292030
CapitalDDR$2,323,368
DPTO$2,076,632
LF$4,400,000
Total for Project 450301-1$8,800,000
## 450535 -1 - SARASOTA BRADENTON INTL AIRPORT GENERAL AVIATION FIS Type of Work: AVIATION SAFETY PROJECT
PhaseFund Code20262027202820292030
CapitalDPTO$3,700,003
LF$3,700,000
Total for Project 450535-1$7,400,003
450852-1 - SARASOTA BRADENTON INTL AIRPORT TERMINAL EXPANSION BAGGAGE IMPROVEMENT Type of Work: AVIATION CAPACITY PROJECT
PhaseFund Code20262027202820292030
CapitalDDR$2,300,000
LF$2,300,000
Total for Project 450852-1$4,600,000
451402-1 - VENICE MUNICIPAL AIRPORT MAINTENANCE FACILITY Type of Work: AVIATION REVENUE/OPERATIONAL
PhaseFund Code20262027202820292030
CapitalDDR$80,000
DPTO$640,000
LF$20,000$160,000
Total for Project 451402-1$100,000$800,000
## 453790 -1 - SARASOTA BRADENTON INTL AIRPORT TERMINAL PARKING GARAGE Type of Work: AVIATION REVENUE/OPERATIONAL
PhaseFund Code20262027202820292030
CapitalDPTO$1,000,000$2,500,000$2,500,000
LF$1,000,000$2,500,000$2,500,000
Total for Project 453790-1$2,000,000$5,000,000$5,000,000
===== PAGE 14 ===== ## SARASOTA COUNTY
456015-1 - SARASOTA BRADENTON INTL AIRPORT EXPAND BAGGAGE CLAIM AREA Type of Work: AVIATION CAPACITY PROJECT
PhaseFund Code20262027202820292030
CapitalLF$900,000
SIWR$900,000
Total for Project 456015-1$1,800,000
===== PAGE 15 ===== ## SARASOTA COUNTY
410144-1 - SARASOTA COUNTY STATE TRANSIT BLOCK GRANT OPERATING ASSISTANCE Type of Work: OPERATING FOR FIXED ROUTE
PhaseFund Code20262027202820292030
OperationsDDR$2,012,583$2,069,089$2,131,162$2,195,097$2,260,950
LF$2,012,583$2,069,089$2,131,162$2,195,097$2,260,950
Total for Project 410144-1$4,025,166$4,138,178$4,262,324$4,390,194$4,521,900
## 410152 -1 - SARASOTA COUNTY/SAR-BRADENTON UZA/FTA SECTION 5307 CAPITAL ASSIST Type of Work: CAPITAL FOR FIXED ROUTE
PhaseFund Code20262027202820292030
CapitalFTA$5,592,185$5,515,737$10,654,845$9,757,391
LF$1,398,046$1,378,934$2,663,711$2,439,348
Total for Project 410152-1$6,990,231$6,894,671$13,318,556$12,196,739
## 434528 -1 - SARASOTA CO/SAR-BRADENTON UZA FTA SECTION 5339 CAPITAL ASSISTANCE Type of Work: CAPITAL FOR FIXED ROUTE
PhaseFund Code20262027202820292030
CapitalFTA$818,089$741,286$887,312$912,452
LF$204,522$185,322$221,828$228,113
Total for Project 434528-1$1,022,611$926,608$1,109,140$1,140,565
## 434610 -1 - SARASOTA CTY-SMALL URBAN N PORT-PUNTA GORDA FTA SECT 5307 OPER ASSIST Type of Work: OPERATING FOR FIXED ROUTE
PhaseFund Code20262027202820292030
OperationsFTA$465,037$748,860$2,204,194$2,012,713$2,766,805
LF$465,037$748,860$2,204,194$2,012,713$2,766,805
Total for Project 434610-1$930,074$1,497,720$4,408,388$4,025,426$5,533,610
## 434610 -2 - SARASOTA CTY/SMALL URBAN N PORT-PUNTA GORDA/FTA SEC 5307 CAP ASSIST Type of Work: CAPITAL FOR FIXED ROUTE
PhaseFund Code20262027202820292030
CapitalFTA$641,513$174,860$22,264$260,062$307,422
LF$160,378$43,715$5,566$65,016$76,856
Total for Project 434610-2$801,891$218,575$27,830$325,078$384,278
===== PAGE 16 ===== ## SARASOTA COUNTY
440266-1 - SARASOTA COUNTY-SAR-BRADENTON UZA/FTA SECT 5307 OPERATING ASSISTANCE Type of Work: OPERATING FOR FIXED ROUTE
PhaseFund Code20262027202820292030
OperationsFTA$710,696$700,900$1,429,464$1,106,246
LF$710,696$700,900$1,429,464$1,106,246
Total for Project 440266-1$1,421,392$1,401,800$2,858,928$2,212,492
## 448714 -1 - CITY OF SARASOTA - OPERATING - CORRIDOR PILOT PROJECT
Type of Work: URBAN CORRIDOR IMPROVEMENTS
PhaseFund Code20262027202820292030
OperationsDPTO$371,057$259,740
LF$371,057$259,740
Total for Project 448714-1$742,114$519,480
## 453564 -1 - SARASOTA COUNTY OPERATING ASSISTANCE CORRIDOR US41
Type of Work: URBAN CORRIDOR IMPROVEMENTS
PhaseFund Code20262027202820292030
OperationsDDR$969,562$455,211$455,211$969,562
DPTO$969,562$514,351$514,351
LF$969,562$969,562$969,562$969,562
Total for Project 453564-1$969,562$1,939,124$1,939,124$1,939,124$1,939,124
## 455239-1 - SARASOTA COUNTY OPERATING SERVICE DEVELOPMENT ROUTE 77 EXPANSION Type of Work: OPERATING FOR FIXED ROUTE
PhaseFund Code20262027202820292030
OperationsDDR$820,462
LF$820,462
Total for Project 455239-1$1,640,924
===== PAGE 17 ===== ## SARASOTA COUNTY
SARASOTA COUNTYTransportation Planning
439315-5 - SARASOTA/MANATEE MPO FY 2024/2025-2025/2026 UPWP
Type of Work: TRANSPORTATION PLANNING
PhaseFund Code20262027202820292030
PlanningPL$1,551,820
SU$1,000,000
Total for Project 439315-5$2,551,820
## 439315 -6 - SARASOTA/MANATEE MPO FY 2026/2027-2027/2028 UPWP Type of Work: TRANSPORTATION PLANNING
PhaseFund Code20262027202820292030
PlanningPL$1,551,820$1,551,820
SU$1,000,000$1,000,000
Total for Project 439315-6$2,551,820$2,551,820
## 439315 -7 - SARASOTA/MANATEE MPO FY 2028/2029-2029/2030 UPWP Type of Work: TRANSPORTATION PLANNING
PhaseFund Code20262027202820292030
PlanningPL$1,551,820$1,551,820
SU$1,000,000$1,000,000
Total for Project 439315-7$2,551,820$2,551,820
===== PAGE 18 ===== ## Fund Codes
FederalACBR - ADVANCE CONSTRUCTION (BRT)ACNP - ADVANCE CONSTRUCTION NHPPACNR - AC NAT HWY PERFORM RESURFACING
ACPR - AC - PROTECT GRANT PGMACSS - ADVANCE CONSTRUCTION (SS,HSP)ACSU - ADVANCE CONSTRUCTION (SU)
FAA - FEDERAL AVIATION ADMINFTA - FEDERAL TRANSIT ADMINISTRATIONGFBR - GEN FUND BRIDGE REPAIR/REPLACE
PL - METRO PLAN (85% FA; 15% OTHER) TALT - TRANSPORTATION ALTS- ANY AREASA - STP, ANY AREA TALU - TRANSPORTATION ALTS- >200KSU - STP, URBAN AREAS > 200K
Federal EarmarkCD23 - CONGRESS GF EARMARKS HIP 2023CD24 - CONGRESS GF EARMARKS HIP 2024PROD - PROTECT DISC. GRANT PROGRAM
LocalLF - LOCAL FUNDS
R/W and Bridge BondsBNIR - INTRASTATE R/W & BRIDGE BONDS
StateBRRP - STATE BRIDGE REPAIR & REHABCIGP - COUNTY INCENTIVE GRANT PROGRAMD - UNRESTRICTED STATE PRIMARY
DDR - DISTRICT DEDICATED REVENUEDIH - STATE IN-HOUSE PRODUCT SUPPORTDITS - STATEWIDE ITS - STATE 100%.
DPTO - STATE - PTODS - STATE PRIMARY HIGHWAYS & PTOFC5 - OPEN GRADE FRICTION COURSE FC5
SIWR - 2015 SB2514A-STRATEGIC INT SYSTLWR - 2015 SB2514A-TRAIL NETWORK