===== PAGE 1 =====
## TENTATIVE WORK PROGRAM PUBLIC HEARING REPORT
FISCAL YEAR 2026 TO FISCAL YEAR 2030
SARASOTA COUNTY
DETAIL REPORT
AS OF 11/14/2024 9:15 PM SUBJECT TO CHANGE
FLORIDA DEPARTMENT OF TRANSPORTATION DISTRICT 1
PROJECTS FUNDED JULY 1, 2025 TO JUNE 30, 2030
VISIT US AT WWW.FDOT.GOV/WPPH/DISTRICT1
===== PAGE 2 =====
## SARASOTA COUNTY
## 201277 -5 - I-75 (SR 93) AT BEE RIDGE ROAD
Type of Work: INTERCHANGE - ADD LANES
| Phase | Fund Code | 2026 | 2027 | 2028 | 2029 | 2030 |
| Preliminary Engineering | LF | | | $280,000 | | |
| Right of Way | BNIR | $4,899,996 | | | | |
| Environmental | ACNP | | | | $200,000 | |
| Total for Project 201277-5 | | $4,899,996 | | $280,000 | $200,000 | |
## 201277 -8 - I-75 (SR 93) AT CLARK RD (SR 72) INTERCHANGE
Type of Work: LANDSCAPING
| Phase | Fund Code | 2026 | 2027 | 2028 | 2029 | 2030 |
| Construction | DDR | $1,695,146 | | | | |
| DIH | $10,300 | | | | |
| Total for Project 201277-8 | | $1,705,446 | | | | |
## 201277 -9 - I-75 AT SR 681 INTERCHANGE IMPROVEMENTS
Type of Work: PD&E/EMO STUDY
| Phase | Fund Code | 2026 | 2027 | 2028 | 2029 | 2030 |
| PD & E | ACNP | | | | $2,501,000 | |
| Total for Project 201277-9 | | | | | $2,501,000 | |
## 412676 -1 - SARASOTA COUNTY TSMCA
Type of Work: TRAFFIC CONTROL DEVICES/SYSTEM
| Phase | Fund Code | 2026 | 2027 | 2028 | 2029 | 2030 |
| Operations | DDR | $545,139 | | $83,413 | | |
| DITS | $181,333 | $755,350 | | | |
| Total for Project 412676-1 | | $726,472 | $755,350 | $83,413 | | |
## 413657 -1 - TOWN OF LONGBOAT KEY TSMCA
Type of Work: TRAFFIC CONTROL DEVICES/SYSTEM
| Phase | Fund Code | 2026 | 2027 | 2028 | 2029 | 2030 |
| Operations | DDR | $23,468 | $24,554 | $25,707 | | |
| Total for Project 413657-1 | | $23,468 | $24,554 | $25,707 | | |
## 413658 -1 - CITY OF NORTH PORT TSMCA
Type of Work: TRAFFIC CONTROL DEVICES/SYSTEM
| Phase | Fund Code | 2026 | 2027 | 2028 | 2029 | 2030 |
| Operations | DDR | $72,143 | $75,480 | $79,019 | | |
| Total for Project 413658-1 | | $72,143 | $75,480 | $79,019 | | |
===== PAGE 3 =====
## SARASOTA COUNTY
## 413659 -1 - CITY OF SARASOTA TSMCA
Type of Work: TRAFFIC CONTROL DEVICES/SYSTEM
| Phase | Fund Code | 2026 | 2027 | 2028 | 2029 | 2030 |
| Operations | DDR | $281,868 | | $33,900 | | |
| DITS | | $294,836 | | | |
| Total for Project 413659-1 | | $281,868 | $294,836 | $33,900 | | |
## 413660 -1 - CITY OF VENICE TSMCA
Type of Work: TRAFFIC CONTROL DEVICES/SYSTEM
| Phase | Fund Code | 2026 | 2027 | 2028 | 2029 | 2030 |
| Operations | DDR | $63,734 | $66,248 | $68,905 | | |
| Total for Project 413660-1 | | $63,734 | $66,248 | $68,905 | | |
## 420613 -2 - I-75 (SR 93) AT FRUITVILLE ROAD/CR 780
Type of Work: INTERCHANGE - ADD LANES
| Phase | Fund Code | 2026 | 2027 | 2028 | 2029 | 2030 |
| Environmental | DDR | $30,252 | | | | |
| Design Build | DIH | | $5,310 | | | |
| Total for Project 420613-2 | | $30,252 | $5,310 | | | |
## 436680 -2 - SR 789 (RINGLING) FROM BIRD KEY DRIVE TO SARASOTA HARBOR WEST
Type of Work: BRIDGE REPLACEMENT
| Phase | Fund Code | 2026 | 2027 | 2028 | 2029 | 2030 |
| Construction | ACBR | | | $66,866,262 | | |
| Total for Project 436680-2 | | | | $66,866,262 | | |
## 444634 -2 - SR 72 FROM EAST OF I-75 TO EAST OF IBIS
Type of Work: ADD LANES & RECONSTRUCT
| Phase | Fund Code | 2026 | 2027 | 2028 | 2029 | 2030 |
| Preliminary Engineering | ACSU | $2,301,000 | | | | |
| Total for Project 444634-2 | | $2,301,000 | | | | |
## 445059 -1 - RIVER RD FROM US 41 TO I-75
Type of Work: ADD LANES & RECONSTRUCT
| Phase | Fund Code | 2026 | 2027 | 2028 | 2029 | 2030 |
| Repayment | DDR | $12,972,437 | $7,667,050 | | | |
| Total for Project 445059-1 | | $12,972,437 | $7,667,050 | | | |
===== PAGE 4 =====
## SARASOTA COUNTY
| 445409-2 - SR 45 (US 41) SB OVER SOUTH CREEK BRIDGE REPLACEMENT BRIDGE # 170014 |
| Type of Work: BRIDGE REPLACEMENT |
| Phase | Fund Code | 2026 | 2027 | 2028 | 2029 | 2030 |
| Preliminary Engineering | ACBR | | | | $780,000 | |
| Total for Project 445409-2 | | | | | $780,000 | |
## 446680 -2 - PINEBROOK RD FROM S OF E VENCIE AVE TO N OF RIDGEWOOD AVE
Type of Work: MISCELLANEOUS CONSTRUCTION
| Phase | Fund Code | 2026 | 2027 | 2028 | 2029 | 2030 |
| Construction | CIGP | | | | $500,000 | |
| LF | | | | $500,000 | |
| Total for Project 446680-2 | | | | | $1,000,000 | |
## 447255 -1 - INKWOOD DR OVER LITTLE FIELD WATERWAY BRIDGE #175030
Type of Work: BRIDGE REPLACEMENT
| Phase | Fund Code | 2026 | 2027 | 2028 | 2029 | 2030 |
| Construction | GFBR | | $2,459,117 | | | |
| LF | | $734,648 | | | |
| SA | | $21,240 | | | |
| Total for Project 447255-1 | | | $3,215,005 | | | |
## 447882 -1 - SR 776 FROM CHARLOTTE COUNTY LINE TO TANGERINE WOODS BLVD
Type of Work: MEDIAN MODIFICATION
| Phase | Fund Code | 2026 | 2027 | 2028 | 2029 | 2030 |
| Construction | ACSS | $792,242 | | | | |
| SU | $1,087,304 | | | | |
| Environmental | TALT | $150,000 | | | | |
| Total for Project 447882-1 | | $2,029,546 | | | | |
## 447887 -1 - SR 72 FROM SWIFT RD TO SAWYER RD
Type of Work: MEDIAN MODIFICATION
| Phase | Fund Code | 2026 | 2027 | 2028 | 2029 | 2030 |
| Construction | ACSS | $1,801,448 | | | | |
| SU | $1,500,430 | | | | |
| Total for Project 447887-1 | | $3,301,878 | | | | |
===== PAGE 5 =====
## SARASOTA COUNTY
## 448070 -1 - CIRCUS DRAWBRIDGE REHABILITATION BRIDGE #S 170167 & 170168
Type of Work: BRIDGE-REPAIR/REHABILITATION
| Phase | Fund Code | 2026 | 2027 | 2028 | 2029 | 2030 |
| Preliminary Engineering | BRRP | | $489,025 | | | |
| Construction | BRRP | | | $4,048,613 | | |
| DIH | | | $1,096 | | |
| Total for Project 448070-1 | | | $489,025 | $4,049,709 | | |
## 449122 -1 - SR 72 FROM US 41 (SR 45) TO E OF DEREK AVE Type of Work: RESURFACING
| Phase | Fund Code | 2026 | 2027 | 2028 | 2029 | 2030 |
| Construction | ACNR | $2,707,946 | | | | |
| ACPR | $10,108,632 | | | | |
| SA | $1,338,573 | | | | |
| SU | $300,431 | | | | |
| Total for Project 449122-1 | | $14,455,582 | | | | |
## 449122 -2 - SR 72 FROM E OF DEREK AVE TO E OF HONORE AVE
Type of Work: FLEXIBLE PAVEMENT RECONSTRUCT.
| Phase | Fund Code | 2026 | 2027 | 2028 | 2029 | 2030 |
| Right of Way | DIH | | $156,000 | | | |
| DS | | $1,444,000 | | | |
| Total for Project 449122-2 | | | $1,600,000 | | | |
## 449188 -1 - I-75 (SR 93) FROM SR 681 TO SR 780
Type of Work: RESURFACING
| Phase | Fund Code | 2026 | 2027 | 2028 | 2029 | 2030 |
| Preliminary Engineering | ACNP | $2,001,000 | | | | |
| Construction | ACNP | | | $35,813,413 | | |
| Total for Project 449188-1 | | $2,001,000 | | $35,813,413 | | |
## 450843 -2 - FRUITVILLE RD FROM LORRAINE RD TO BOURNESIDE RD
Type of Work: ADD LANES & RECONSTRUCT
| Phase | Fund Code | 2026 | 2027 | 2028 | 2029 | 2030 |
| Preliminary Engineering | CD24 | $4,000,000 | | | | |
| Total for Project 450843-2 | | $4,000,000 | | | | |
===== PAGE 6 =====
## SARASOTA COUNTY
451010-1 - SR 45 (US 41) FROM N OF 14TH STREET TO S OF DR MLK JR WAY Type of Work: PAVEMENT ONLY RESURFACE (FLEX)
| Phase | Fund Code | 2026 | 2027 | 2028 | 2029 | 2030 |
| Construction | DIH | | | $5,480 | | |
| DS | | | $1,535,168 | | |
| Total for Project 451010-1 | | | | $1,540,648 | | |
## 451011 -2 - SR 45 (US 41) FROM N OF MYRTLE ST TO S OF GENERAL SPAATZ BLVD
Type of Work: SAFETY PROJECT
| Phase | Fund Code | 2026 | 2027 | 2028 | 2029 | 2030 |
| Construction | ACSS | $10,300 | | | | |
| Total for Project 451011-2 | | $10,300 | | | | |
451011-3 - SR 45 (US 41) FROM N OF MYRTLE ST TO S OF GENERAL SPAATZ BLVD Type of Work: PAVEMENT ONLY RESURFACE (FLEX)
| Phase | Fund Code | 2026 | 2027 | 2028 | 2029 | 2030 |
| Construction | DDR | $306,083 | | | | |
| DIH | $5,150 | | | | |
| DS | $3,956,669 | | | | |
| Total for Project 451011-3 | | $4,267,902 | | | | |
## 451011 -4 - SR 45 (US 41) FROM N OF MYRTLE ST TO S OF GENERAL SPAATZ BLVD
Type of Work: SAFETY PROJECT
| Phase | Fund Code | 2026 | 2027 | 2028 | 2029 | 2030 |
| Construction | ACSS | $488,096 | | | | |
| SU | $498,396 | | | | |
| Total for Project 451011-4 | | $986,492 | | | | |
## 451013 -1 - SR 789 FROM LONGBOAT CLUB RD TO MANATEE CO LINE
Type of Work: PAVEMENT ONLY RESURFACE (FLEX)
| Phase | Fund Code | 2026 | 2027 | 2028 | 2029 | 2030 |
| Construction | DDR | | $5,155,601 | | | |
| DIH | $5,150 | | | | |
| Total for Project 451013-1 | | $5,150 | $5,155,601 | | | |
## 451014 -1 - SR 776 FROM CHARLOTTE CO LINE TO S OF US 41
Type of Work: PAVEMENT ONLY RESURFACE (FLEX)
| Phase | Fund Code | 2026 | 2027 | 2028 | 2029 | 2030 |
| Construction | DDR | $18,691,101 | | | | |
| DIH | $51,500 | | | | |
| Total for Project 451014-1 | | $18,742,601 | | | | |
===== PAGE 7 =====
## SARASOTA COUNTY
451017-1 - SR 683 (US 301) FROM US 41 TO S OF 10TH ST Type of Work: RESURFACING
| Phase | Fund Code | 2026 | 2027 | 2028 | 2029 | 2030 |
| Construction | ACNR | $7,453,535 | | | | |
| DIH | $5,150 | | | | |
| SA | $854,201 | | | | |
| SU | $453,453 | | | | |
| Total for Project 451017-1 | | $8,766,339 | | | | |
## 451280-1 - SR 758 OVER SARASOTA BAY BRIDGE NO 170061 Type of Work: BRIDGE-REPAIR/REHABILITATION
| Phase | Fund Code | 2026 | 2027 | 2028 | 2029 | 2030 |
| Construction | BRRP | $4,181,425 | | | | |
| DIH | $10,300 | | | | |
| Total for Project 451280-1 | | $4,191,725 | | | | |
## 451389 -1 - BEACH RD FROM AVENIDA DEL MARE TO MIDNIGHT PASS RD
Type of Work: PUBLIC TRANSPORTATION SHELTER
| Phase | Fund Code | 2026 | 2027 | 2028 | 2029 | 2030 |
| Construction | LF | | $120,000 | | | |
| SU | | $26,161 | | | |
| TALU | | $449,839 | | | |
| Total for Project 451389-1 | | | $596,000 | | | |
## 451734 -1 - I-75 (SR 93) FROM SR 777 TO SR 681
Type of Work: RESURFACING
| Phase | Fund Code | 2026 | 2027 | 2028 | 2029 | 2030 |
| Design Build | ACNP | $40,053,629 | | | | |
| Total for Project 451734-1 | | $40,053,629 | | | | |
## 452172 -1 - SARASOTA COUNTY SUBMARINE CABLE REPLACEMENT
Type of Work: BRIDGE-REPAIR/REHABILITATION
| Phase | Fund Code | 2026 | 2027 | 2028 | 2029 | 2030 |
| Preliminary Engineering | BRRP | $474,762 | | | | |
| Construction | BRRP | | $4,433,679 | | | |
| Total for Project 452172-1 | | $474,762 | $4,433,679 | | | |
===== PAGE 8 =====
## SARASOTA COUNTY
452784-1 - SR 45 (US 41/US 41B) FROM S OF SR 758 (BEE RIDGE RD) TO S OF SR 683 Type of Work: RESURFACING
| Phase | Fund Code | 2026 | 2027 | 2028 | 2029 | 2030 |
| Preliminary Engineering | DIH | $1,000 | | | | |
| DS | $1,301,000 | | | | |
| Construction | ACNR | | | $11,266,925 | | |
| ACSS | | | $570,591 | | |
| DIH | | | $5,480 | | |
| DS | | | $1,674,765 | | |
| Total for Project 452784-1 | | $1,302,000 | | $13,517,761 | | |
453226-1 - SR 777 RIVER RD FROM US 41 (SR 45) TO OBSERVATION BLVD Type of Work: LANDSCAPING
| Phase | Fund Code | 2026 | 2027 | 2028 | 2029 | 2030 |
| Construction | DDR | | | $1,365,763 | | |
| DIH | $1,030 | | | | |
| DS | | | $240,611 | | |
| Total for Project 453226-1 | | $1,030 | | $1,606,374 | | |
453537-1 - US41/S TAMIAMI TRAIL FROM SIESTA DR TO SR683/US301 ATSPM/CV UPGRADE Type of Work: ATMS - ARTERIAL TRAFFIC MGMT
| Phase | Fund Code | 2026 | 2027 | 2028 | 2029 | 2030 |
| Construction | SU | | | $2,285,839 | | |
| Total for Project 453537-1 | | | | $2,285,839 | | |
## 453538 -1 - US 41 (SR 45) GULF GATE DR TO BEE RIDGE RD ATSPM/CV UPGRADE Type of Work: ATMS - ARTERIAL TRAFFIC MGMT
| Phase | Fund Code | 2026 | 2027 | 2028 | 2029 | 2030 |
| Construction | SU | | | $3,699,594 | | |
| Total for Project 453538-1 | | | | $3,699,594 | | |
## 453539 -1 - SR 780/FRUITVILLE RD FROM US 301 TO HONORE AVENUE ATSPM CV UPGRADE
Type of Work: ATMS - ARTERIAL TRAFFIC MGMT
| Phase | Fund Code | 2026 | 2027 | 2028 | 2029 | 2030 |
| Construction | SU | | | $4,783,162 | | |
| Total for Project 453539-1 | | | | $4,783,162 | | |
## 454945 -1 - WINCHESTER BLVD FROM CHARLOTTE COUNTY LINE TO S RIVER RD Type of Work: ADD LANES & RECONSTRUCT
| Phase | Fund Code | 2026 | 2027 | 2028 | 2029 | 2030 |
| Construction | CD23 | $1,000,000 | | | | |
| Total for Project 454945-1 | | $1,000,000 | | | | |
===== PAGE 9 =====
## SARASOTA COUNTY
| 455147-1 - MANASOTA KEY BASCULE BRIDGE - REHABILITATION AND STORM HARDENING |
| Type of Work: BRIDGE-REPAIR/REHABILITATION |
| Phase | Fund Code | 2026 | 2027 | 2028 | 2029 | 2030 |
| Construction | PROD | $6,030,000 | | | | |
| Total for Project 455147-1 | | $6,030,000 | | | | |
## 455186 -1 - SR45(US41) FROM SR776 TO NORTH OF CENTER RD
Type of Work: SAFETY PROJECT
| Phase | Fund Code | 2026 | 2027 | 2028 | 2029 | 2030 |
| Preliminary Engineering | ACSS | | | | $510,000 | |
| Total for Project 455186-1 | | | | | $510,000 | |
## 455381 -1 - I-75 AT SR 681 INTERCHANGE IMPROVEMENTS
Type of Work: INTERCHANGE - ADD LANES
| Phase | Fund Code | 2026 | 2027 | 2028 | 2029 | 2030 |
| Preliminary Engineering | ACNP | | | | $3,010,000 | |
| Total for Project 455381-1 | | | | | $3,010,000 | |
## 456038 -1 - SR 681 FROM SOUTH OF ISLA PALMA LANE TO SOUTH OF I-75
Type of Work: PAVEMENT ONLY RESURFACE (FLEX)
| Phase | Fund Code | 2026 | 2027 | 2028 | 2029 | 2030 |
| Construction | FC5 | $329,242 | | | | |
| Total for Project 456038-1 | | $329,242 | | | | |
## 456039 -1 - I-75(SR93) FROM NORTH OF BEE RIDGE ROAD TO SOUTH OF FRUITVILLE ROAD Type of Work: PAVEMENT ONLY RESURFACE (FLEX)
| Phase | Fund Code | 2026 | 2027 | 2028 | 2029 | 2030 |
| Construction | FC5 | $61,072 | | | | |
| Total for Project 456039-1 | | $61,072 | | | | |
===== PAGE 10 =====
## SARASOTA COUNTY
## 412584 -1 - SARASOTA COUNTY HIGHWAY LIGHTING
Type of Work: ROUTINE MAINTENANCE
| Phase | Fund Code | 2026 | 2027 | 2028 | 2029 | 2030 |
| Bridge/Roadway/Contract Maintenance | D | $665,548 | $685,521 | | | |
| Total for Project 412584-1 | | $665,548 | $685,521 | | | |
## 413565 -1 - NORTH PORT HIGHWAY LIGHTING
Type of Work: ROUTINE MAINTENANCE
| Phase | Fund Code | 2026 | 2027 | 2028 | 2029 | 2030 |
| Bridge/Roadway/Contract Maintenance | D | $121,640 | $125,290 | | | |
| Total for Project 413565-1 | | $121,640 | $125,290 | | | |
## 413566 -1 - SARASOTA CITY HIGHWAY LIGHTING
Type of Work: ROUTINE MAINTENANCE
| Phase | Fund Code | 2026 | 2027 | 2028 | 2029 | 2030 |
| Bridge/Roadway/Contract Maintenance | D | $351,404 | $361,949 | | | |
| Total for Project 413566-1 | | $351,404 | $361,949 | | | |
## 413567 -1 - VENICE HIGHWAY LIGHTING
Type of Work: ROUTINE MAINTENANCE
| Phase | Fund Code | 2026 | 2027 | 2028 | 2029 | 2030 |
| Bridge/Roadway/Contract Maintenance | D | $118,352 | $121,904 | | | |
| Total for Project 413567-1 | | $118,352 | $121,904 | | | |
## 413807 -1 - LONGBOAT KEY HIGHWAY LIGHTING
Type of Work: ROUTINE MAINTENANCE
| Phase | Fund Code | 2026 | 2027 | 2028 | 2029 | 2030 |
| Bridge/Roadway/Contract Maintenance | D | $57,715 | $59,447 | | | |
| Total for Project 413807-1 | | $57,715 | $59,447 | | | |
## 448729 -1 - SARASOTA ASSET MAINTENANCE
Type of Work: ROUTINE MAINTENANCE
| Phase | Fund Code | 2026 | 2027 | 2028 | 2029 | 2030 |
| Bridge/Roadway/Contract Maintenance | D | $2,698,974 | $2,698,974 | $2,698,974 | $1,349,487 | |
| Total for Project 448729-1 | | $2,698,974 | $2,698,974 | $2,698,974 | $1,349,487 | |
===== PAGE 11 =====
## SARASOTA COUNTY
455928-1 - BENEVA RD TO BOBBY JONES GOLF CLUB / CIRCUS BLVD
Type of Work: BIKE PATH/TRAIL
| Phase | Fund Code | 2026 | 2027 | 2028 | 2029 | 2030 |
| Preliminary Engineering | TLWR | $550,000 | | | | |
| Total for Project 455928-1 | | $550,000 | | | | |
===== PAGE 12 =====
## SARASOTA COUNTY
| 438750-1 - VENICE MUNICIPAL AIRPORT |
| Type of Work: AVIATION PRESERVATION PROJECT |
| Phase | Fund Code | 2026 | 2027 | 2028 | 2029 | 2030 |
| Capital | DPTO | $500,000 | | | | |
| LF | $125,000 | | | | |
| Total for Project 438750-1 | | $625,000 | | | | |
## 444676-1 - SARASOTA-BRADENTON INT'L ARPT EMERGENCY OPERATIONS CENTER Type of Work: AVIATION REVENUE/OPERATIONAL
| Phase | Fund Code | 2026 | 2027 | 2028 | 2029 | 2030 |
| Capital | DPTO | | | | $675,000 | |
| LF | | | | $675,000 | |
| Total for Project 444676-1 | | | | | $1,350,000 | |
## 444679-1 - SARASOTA-BRADENTON INT'L ARPT RUNWAY 14-32 REHAB W/ PAVED SHOULDERS Type of Work: AVIATION PRESERVATION PROJECT
| Phase | Fund Code | 2026 | 2027 | 2028 | 2029 | 2030 |
| Capital | DPTO | | | | $700,000 | |
| FAA | | | | $12,600,000 | |
| LF | | | | $700,000 | |
| Total for Project 444679-1 | $14,000,000 | |
## 446357 -1 - SARASOTA-BRADENTON INT'L ARPT BAGGAGE HANDLING SYSTEM
Type of Work: AVIATION PRESERVATION PROJECT
| Phase | Fund Code | 2026 | 2027 | 2028 | 2029 | 2030 |
| Capital | DDR | | $1,000,000 | | | |
| DPTO | $2,000,000 | | | | |
| LF | $2,000,000 | $1,000,000 | | | |
| Total for Project 446357-1 | | $4,000,000 | $2,000,000 | | | |
## 450206 -1 - VENICE MUNICIPAL AIRPORT REHABILITATE TAXILANES
Type of Work: AVIATION PRESERVATION PROJECT
| Phase | Fund Code | 2026 | 2027 | 2028 | 2029 | 2030 |
| Capital | DPTO | | | | $2,166,000 | |
| LF | | | | $541,500 | |
| Total for Project 450206-1 | | | | | $2,707,500 | |
===== PAGE 13 =====
## SARASOTA COUNTY
450301-1 - SARASOTA-BRADENTON AIRPORT LAND ACQUISITION PROJECT Type of Work: AVIATION ENVIRONMENTAL PROJECT
| Phase | Fund Code | 2026 | 2027 | 2028 | 2029 | 2030 |
| Capital | DDR | | | $2,323,368 | | |
| DPTO | | | $2,076,632 | | |
| LF | | | $4,400,000 | | |
| Total for Project 450301-1 | $8,800,000 | | |
## 450535 -1 - SARASOTA BRADENTON INTL AIRPORT GENERAL AVIATION FIS
Type of Work: AVIATION SAFETY PROJECT
| Phase | Fund Code | 2026 | 2027 | 2028 | 2029 | 2030 |
| Capital | DPTO | | $3,700,003 | | | |
| LF | | $3,700,000 | | | |
| Total for Project 450535-1 | | | $7,400,003 | | | |
450852-1 - SARASOTA BRADENTON INTL AIRPORT TERMINAL EXPANSION BAGGAGE IMPROVEMENT Type of Work: AVIATION CAPACITY PROJECT
| Phase | Fund Code | 2026 | 2027 | 2028 | 2029 | 2030 |
| Capital | DDR | $2,300,000 | | | | |
| LF | $2,300,000 | | | | |
| Total for Project 450852-1 | | $4,600,000 | | | | |
451402-1 - VENICE MUNICIPAL AIRPORT MAINTENANCE FACILITY Type of Work: AVIATION REVENUE/OPERATIONAL
| Phase | Fund Code | 2026 | 2027 | 2028 | 2029 | 2030 |
| Capital | DDR | | | | $80,000 | |
| DPTO | | | | | $640,000 |
| LF | | | | $20,000 | $160,000 |
| Total for Project 451402-1 | | | | | $100,000 | $800,000 |
## 453790 -1 - SARASOTA BRADENTON INTL AIRPORT TERMINAL PARKING GARAGE
Type of Work: AVIATION REVENUE/OPERATIONAL
| Phase | Fund Code | 2026 | 2027 | 2028 | 2029 | 2030 |
| Capital | DPTO | | | $1,000,000 | $2,500,000 | $2,500,000 |
| LF | | | $1,000,000 | $2,500,000 | $2,500,000 |
| Total for Project 453790-1 | | | | $2,000,000 | $5,000,000 | $5,000,000 |
===== PAGE 14 =====
## SARASOTA COUNTY
456015-1 - SARASOTA BRADENTON INTL AIRPORT EXPAND BAGGAGE CLAIM AREA Type of Work: AVIATION CAPACITY PROJECT
| Phase | Fund Code | 2026 | 2027 | 2028 | 2029 | 2030 |
| Capital | LF | $900,000 | | | | |
| SIWR | $900,000 | | | | |
| Total for Project 456015-1 | | $1,800,000 | | | | |
===== PAGE 15 =====
## SARASOTA COUNTY
410144-1 - SARASOTA COUNTY STATE TRANSIT BLOCK GRANT OPERATING ASSISTANCE Type of Work: OPERATING FOR FIXED ROUTE
| Phase | Fund Code | 2026 | 2027 | 2028 | 2029 | 2030 |
| Operations | DDR | $2,012,583 | $2,069,089 | $2,131,162 | $2,195,097 | $2,260,950 |
| LF | $2,012,583 | $2,069,089 | $2,131,162 | $2,195,097 | $2,260,950 |
| Total for Project 410144-1 | | $4,025,166 | $4,138,178 | $4,262,324 | $4,390,194 | $4,521,900 |
## 410152 -1 - SARASOTA COUNTY/SAR-BRADENTON UZA/FTA SECTION 5307 CAPITAL ASSIST Type of Work: CAPITAL FOR FIXED ROUTE
| Phase | Fund Code | 2026 | 2027 | 2028 | 2029 | 2030 |
| Capital | FTA | $5,592,185 | $5,515,737 | $10,654,845 | $9,757,391 | |
| LF | $1,398,046 | $1,378,934 | $2,663,711 | $2,439,348 | |
| Total for Project 410152-1 | | $6,990,231 | $6,894,671 | $13,318,556 | $12,196,739 | |
## 434528 -1 - SARASOTA CO/SAR-BRADENTON UZA FTA SECTION 5339 CAPITAL ASSISTANCE Type of Work: CAPITAL FOR FIXED ROUTE
| Phase | Fund Code | 2026 | 2027 | 2028 | 2029 | 2030 |
| Capital | FTA | $818,089 | $741,286 | $887,312 | $912,452 | |
| LF | $204,522 | $185,322 | $221,828 | $228,113 | |
| Total for Project 434528-1 | | $1,022,611 | $926,608 | $1,109,140 | $1,140,565 | |
## 434610 -1 - SARASOTA CTY-SMALL URBAN N PORT-PUNTA GORDA FTA SECT 5307 OPER ASSIST Type of Work: OPERATING FOR FIXED ROUTE
| Phase | Fund Code | 2026 | 2027 | 2028 | 2029 | 2030 |
| Operations | FTA | $465,037 | $748,860 | $2,204,194 | $2,012,713 | $2,766,805 |
| LF | $465,037 | $748,860 | $2,204,194 | $2,012,713 | $2,766,805 |
| Total for Project 434610-1 | | $930,074 | $1,497,720 | $4,408,388 | $4,025,426 | $5,533,610 |
## 434610 -2 - SARASOTA CTY/SMALL URBAN N PORT-PUNTA GORDA/FTA SEC 5307 CAP ASSIST Type of Work: CAPITAL FOR FIXED ROUTE
| Phase | Fund Code | 2026 | 2027 | 2028 | 2029 | 2030 |
| Capital | FTA | $641,513 | $174,860 | $22,264 | $260,062 | $307,422 |
| LF | $160,378 | $43,715 | $5,566 | $65,016 | $76,856 |
| Total for Project 434610-2 | | $801,891 | $218,575 | $27,830 | $325,078 | $384,278 |
===== PAGE 16 =====
## SARASOTA COUNTY
440266-1 - SARASOTA COUNTY-SAR-BRADENTON UZA/FTA SECT 5307 OPERATING ASSISTANCE Type of Work: OPERATING FOR FIXED ROUTE
| Phase | Fund Code | 2026 | 2027 | 2028 | 2029 | 2030 |
| Operations | FTA | $710,696 | $700,900 | $1,429,464 | $1,106,246 | |
| LF | $710,696 | $700,900 | $1,429,464 | $1,106,246 | |
| Total for Project 440266-1 | | $1,421,392 | $1,401,800 | $2,858,928 | $2,212,492 | |
## 448714 -1 - CITY OF SARASOTA - OPERATING - CORRIDOR PILOT PROJECT
Type of Work: URBAN CORRIDOR IMPROVEMENTS
| Phase | Fund Code | 2026 | 2027 | 2028 | 2029 | 2030 |
| Operations | DPTO | $371,057 | $259,740 | | | |
| LF | $371,057 | $259,740 | | | |
| Total for Project 448714-1 | | $742,114 | $519,480 | | | |
## 453564 -1 - SARASOTA COUNTY OPERATING ASSISTANCE CORRIDOR US41
Type of Work: URBAN CORRIDOR IMPROVEMENTS
| Phase | Fund Code | 2026 | 2027 | 2028 | 2029 | 2030 |
| Operations | DDR | $969,562 | | $455,211 | $455,211 | $969,562 |
| DPTO | | $969,562 | $514,351 | $514,351 | |
| LF | | $969,562 | $969,562 | $969,562 | $969,562 |
| Total for Project 453564-1 | | $969,562 | $1,939,124 | $1,939,124 | $1,939,124 | $1,939,124 |
## 455239-1 - SARASOTA COUNTY OPERATING SERVICE DEVELOPMENT ROUTE 77 EXPANSION Type of Work: OPERATING FOR FIXED ROUTE
| Phase | Fund Code | 2026 | 2027 | 2028 | 2029 | 2030 |
| Operations | DDR | $820,462 | | | | |
| LF | $820,462 | | | | |
| Total for Project 455239-1 | | $1,640,924 | | | | |
===== PAGE 17 =====
## SARASOTA COUNTY
| SARASOTA COUNTY | Transportation Planning |
| 439315-5 - SARASOTA/MANATEE MPO FY 2024/2025-2025/2026 UPWP |
| Type of Work: TRANSPORTATION PLANNING |
| Phase | Fund Code | 2026 | 2027 | 2028 | 2029 | 2030 |
| Planning | PL | $1,551,820 | | | | |
| SU | $1,000,000 | | | | |
| Total for Project 439315-5 | $2,551,820 | | | | |
## 439315 -6 - SARASOTA/MANATEE MPO FY 2026/2027-2027/2028 UPWP
Type of Work: TRANSPORTATION PLANNING
| Phase | Fund Code | 2026 | 2027 | 2028 | 2029 | 2030 |
| Planning | PL | | $1,551,820 | $1,551,820 | | |
| SU | | $1,000,000 | $1,000,000 | | |
| Total for Project 439315-6 | | | $2,551,820 | $2,551,820 | | |
## 439315 -7 - SARASOTA/MANATEE MPO FY 2028/2029-2029/2030 UPWP
Type of Work: TRANSPORTATION PLANNING
| Phase | Fund Code | 2026 | 2027 | 2028 | 2029 | 2030 |
| Planning | PL | | | | $1,551,820 | $1,551,820 |
| SU | | | | $1,000,000 | $1,000,000 |
| Total for Project 439315-7 | | | | | $2,551,820 | $2,551,820 |
===== PAGE 18 =====
## Fund Codes
| Federal | ACBR - ADVANCE CONSTRUCTION (BRT) | ACNP - ADVANCE CONSTRUCTION NHPP | ACNR - AC NAT HWY PERFORM
RESURFACING |
| ACPR - AC - PROTECT GRANT PGM | ACSS - ADVANCE CONSTRUCTION
(SS,HSP) | ACSU - ADVANCE CONSTRUCTION (SU) |
| FAA - FEDERAL AVIATION ADMIN | FTA - FEDERAL TRANSIT
ADMINISTRATION | GFBR - GEN FUND BRIDGE
REPAIR/REPLACE |
| PL - METRO PLAN (85% FA; 15% OTHER)
TALT - TRANSPORTATION ALTS- ANY
AREA | SA - STP, ANY AREA
TALU - TRANSPORTATION ALTS- >200K | SU - STP, URBAN AREAS > 200K |
| Federal Earmark | CD23 - CONGRESS GF EARMARKS HIP
2023 | CD24 - CONGRESS GF EARMARKS HIP
2024 | PROD - PROTECT DISC. GRANT PROGRAM |
| Local | LF - LOCAL FUNDS |
| R/W and Bridge Bonds | BNIR - INTRASTATE R/W & BRIDGE BONDS |
| State | BRRP - STATE BRIDGE REPAIR & REHAB | CIGP - COUNTY INCENTIVE GRANT
PROGRAM | D - UNRESTRICTED STATE PRIMARY |
| DDR - DISTRICT DEDICATED REVENUE | DIH - STATE IN-HOUSE PRODUCT
SUPPORT | DITS - STATEWIDE ITS - STATE 100%. |
| DPTO - STATE - PTO | DS - STATE PRIMARY HIGHWAYS & PTO | FC5 - OPEN GRADE FRICTION COURSE FC5 |
| SIWR - 2015 SB2514A-STRATEGIC INT
SYS | TLWR - 2015 SB2514A-TRAIL NETWORK | |