452784-1 - SR 45 (US 41/US 41B) FROM S OF SR 758 (BEE RIDGE RD) TO S OF SR 683 Type of Work: RESURFACING
Phase Fund Code 2026 2027 2028 2029 2030
Preliminary Engineering DIH $1,000
Construction ACNR $11,266,925
DS $1,301,000
ACSS $570,591
DIH $5,480
DS $1,674,765
Total for Project 452784-1 $1,302,000 $13,517,761
Phase Fund Code 2026 2027 2028 2029 2030
453226-1 - SR 777 RIVER RD FROM US 41 (SR 45) TO OBSERVATION BLVD Type of Work: LANDSCAPING
Construction DDR $1,365,763
DIH $1,030
DS $240,611
Total for Project 453226-1 $1,030 $1,606,374
453537-1 - US41/S TAMIAMI TRAIL FROM SIESTA DR TO SR683/US301 ATSPM/CV UPGRADE Type of Work: ATMS - ARTERIAL TRAFFIC MGMT
| Phase | Fund Code | 2026 | 2027 | 2028 | 2029 | 2030 |
|---|
| Construction | SU | | | $2,285,839 | | |
|---|
| Total for Project 453537-1 | | | | $2,285,839 | | |
|---|
| Phase | Fund Code | 2026 | 2027 | 2028 | 2029 | 2030 |
|---|
| Construction | SU | | | $3,699,594 | | |
|---|
| Total for Project 453538-1 | | | | $3,699,594 | | |
|---|
| Phase | Fund Code | 2026 | 2027 | 2028 | 2029 | 2030 |
|---|
| Construction | SU | | | $4,783,162 | | |
|---|
| Total for Project 453539-1 | | | | $4,783,162 | | |
|---|
| Phase | Fund Code | 2026 | 2027 | 2028 | 2029 | 2030 |
|---|
| Construction | CD23 | $1,000,000 | | | | |
|---|
| Total for Project 454945-1 | | $1,000,000 | | | | |
|---|
Type of Work: ATMS - ARTERIAL TRAFFIC MGMT