451017-1 - SR 683 (US 301) FROM US 41 TO S OF 10TH ST Type of Work: RESURFACING
Phase Fund Code 2026 2027 2028 2029 2030
Construction ACNR $7,453,535
DIH $5,150
SA $854,201
SU $453,453
Total for Project 451017-1 $8,766,339
| Phase | Fund Code | 2026 | 2027 | 2028 | 2029 | 2030 |
|---|
| Construction | BRRP | $4,181,425 | | | | |
|---|
| DIH | $10,300 | | | | |
|---|
| Total for Project 451280-1 | | $4,191,725 | | | | |
|---|
Phase Fund Code 2026 2027 2028 2029 2030
Construction LF $120,000
SU $26,161
TALU $449,839
Total for Project 451389-1 $596,000
| Phase | Fund Code | 2026 | 2027 | 2028 | 2029 | 2030 |
|---|
| Design Build | ACNP | $40,053,629 | | | | |
|---|
| Total for Project 451734-1 | | $40,053,629 | | | | |
|---|
| Phase | Fund Code | 2026 | 2027 | 2028 | 2029 | 2030 |
|---|
| Preliminary Engineering | BRRP | $474,762 | | | | |
|---|
| Construction | BRRP | | $4,433,679 | | | |
|---|
| Total for Project 452172-1 | | $474,762 | $4,433,679 | | | |
|---|
Type of Work: PUBLIC TRANSPORTATION SHELTER
Type of Work: RESURFACING
Type of Work: BRIDGE-REPAIR/REHABILITATION