Type of Work: BRIDGE-REPAIR/REHABILITATION
| Phase | Fund Code | 2026 | 2027 | 2028 | 2029 | 2030 |
|---|
| Preliminary Engineering | BRRP | | $489,025 | | | |
|---|
| Construction | BRRP | | | $4,048,613 | | |
|---|
| DIH | | | $1,096 | | |
|---|
| Total for Project 448070-1 | | | $489,025 | $4,049,709 | | |
|---|
Phase Fund Code 2026 2027 2028 2029 2030
Construction ACNR $2,707,946
ACPR $10,108,632
SA $1,338,573
SU $300,431
Total for Project 449122-1 $14,455,582
Phase Fund Code 2026 2027 2028 2029 2030
Right of Way DIH $156,000
DS $1,444,000
Total for Project 449122-2 $1,600,000
| Phase | Fund Code | 2026 | 2027 | 2028 | 2029 | 2030 |
|---|
| Preliminary Engineering | ACNP | $2,001,000 | | | | |
|---|
| Construction | ACNP | | | $35,813,413 | | |
|---|
| Total for Project 449188-1 | | $2,001,000 | | $35,813,413 | | |
|---|
| Phase | Fund Code | 2026 | 2027 | 2028 | 2029 | 2030 |
|---|
| Preliminary Engineering | CD24 | $4,000,000 | | | | |
|---|
| Total for Project 450843-2 | | $4,000,000 | | | | |
|---|
Type of Work: FLEXIBLE PAVEMENT RECONSTRUCT.
Type of Work: RESURFACING
Type of Work: ADD LANES & RECONSTRUCT