| Project Details | |
| Work Type | Repaving |
|---|---|
| Phase | Construction |
| Limits | at the Southbound Skyway Toll Plaza |
| Project Start | November 2, 2026 |
| Length | 1 mile |
| Road | I-275 |
| Construction Cost | $655,000 |
| Estimated Completion | Early 2027 |
| Contractor | Pigott Asphalt and Sitework LLC |
Contact Information
Project Information
Maddie Griffin 727-575-8334
Maddie.Griffin@dot.state.fl.us
Media Contact
Kayla Mejia 813-975-6060
Kayla.Mejia@dot.state.fl.us
About
This project will repave I-275 through the southbound Skyway toll plaza in Pinellas County. Lane closures and traffic shifts can be expected as crews pave all lanes and the shoulder areas through the toll plaza. Be sure to subscribe to receive construction notifications via email. Once final configuration is in place, traffic will continue to move through the toll plaza. The two inside lanes will accommodate most vehicles, while the outside lane will be designated for wide-load vehicles. The speed limit through the plaza will remain at 25 mph. Work zone safety is everyone's job! Click to learn more: Work Zone Safety It's Everyone's Job
Construction is expected to be complete in early 2027.
For more information on this project, or to sign-up to receive construction updates and traffic alerts, please visit FDOTtampabay.com (Project Number: 456549-1-52) Last Updated: 11/03/2026