Project Funding
| Phase | Cost | Fiscal Year |
|---|
| Vision Study | $374,000 | 2021 |
|---|
| Design | $1.83 million | Ongoing |
|---|
| Right-of-Way Acquisition | $136,000 | Ongoing |
|---|
| Construction | $6.62 million | 2024 |
|---|
At this time, the F D O T 's Tentative Five-Year Work Program includes funding for the Design, Right-of-Way, and Construction Phases. The Design and Right-of-way phases are currently ongoing. Construction is anticipated to begin in 2024.