| Project Details | |
| Work Type | Striping |
|---|---|
| Phase | Completed |
| Project Start | January 2021 |
| City | Tampa |
| County | Hillsborough |
| Road | 39th Street50th StreetAdamo DriveJackson StreetKennedyBoulevardNebraskaAvenue(Hillsborough)SR 60US 41US 41 Business |
| Construction Cost | $133,000 |
| Estimated Completion | Spring 2021 |
| Contractor | AKCA, LLC |
This project will install Dynamic Envelopes at multiple railroad crossings in Hillsborough County.
The crossings include:
Contact Information
Project Information
Kouser Manzer
813-612-3200
Kouser.Manzer@dot.state.fl.us
Dynamic envelopes are roadway markings used to increase safe stopping behavior and safety for both vehicular and pedestrian traffic at grade rail crossings. These markings indicate the clearance needed for trains to safely pass.
By keeping vehicles outside of the dynamic envelopes, fewer vehicles will be stopped too close to or actually on the tracks, thereby reducing the danger to vehicles, occupants, train crews, passengers and bystanders.
The goal is to positively influence driver behavior and reduce the number of incidents and injuries sustained at rail crossings.
The project began in January of 2021 and is expected to finish in the spring 2021.
Media Contact
Kayla Mejia
813-975-6060
Kayla.Mejia@dot.state.fl.us This project will install Dynamic Envelopes at multiple railroad crossings in Hillsborough County.