Page 22 of 34
MOTION TO APPROVE BY: SAUICKIE MOTION SECONDED BY: BORRELLI YES: BORRELLI, CHISHOLM, SAUICKIE, FLEMMING, KERN
WHEREAS, the Township of Jackson previously awarded a contract to Captain Construction for the project known as “2019 Roadway Drainage Improvements” in the amount of $194,899.00; and
WHEREAS, Township Engineer, Julio Vega, Jr., has recommended the approval of As-Built/Close-Out Change Order No. 1, decreasing the contract by $16,567.20 as a result of final as-built quantities (per attached “Schedule A”); and
WHEREAS, the approval of this As-Built/Close-Out Change Order #1 will result in the return of the performance guarantee posted for this project. The return of said performance guarantee will be contingent upon the posting and acceptance of any required Maintenance Guarantee.
WHEREAS, it is now the desire of the Township Council to act upon the Engineer's recommendation and to approve said Close-Out Change Order No. 1.
JANICE KISTY, R.M.C. TOWNSHIP CLERK
DATED: 3-23-2021
RESOLUTION 149R-21
MOTION TO APPROVE BY: BORRELLI MOTION SECONDED BY: CHISHOLM YES: BORRELLI, CHISHOLM, SAUICKIE, FLEMMING, KERN
WHEREAS, there exists a need for professional engineering services related to the FY 2021 Roadway Improvement Program; and
WHEREAS, the performance of these services requires knowledge of an advanced type in a field of learning pursuant to N.J.S.A. 40A:11-2, and the Township has determined that T&M Associates has the ability and expertise to perform the Municipal services required by the Township and is duly qualified to serve as Special Engineer; and