Analysis - Proposed Conditions NOA Prepared by Civil Core Consulting HydroCAD® 10.20-7a s/n 13637 © 2025 HydroCAD Software Solutions LL
NOAA 24-hr D 10 YR-C Rainfall=5.38" Printed 10/24/2025
Stage-Area-Storage for Pond 39P: Subsurface Basin Lot 2
Elevation (feet)Surface (acres)Storage (acre-feet)
93.000.0090.000
93.050.0090.000
93.100.0090.000
93.150.0090.001
93.200.0090.001
93.250.0090.001
93.300.0090.001
93.350.0090.001
93.400.0090.001
93.450.0090.001
93.500.0090.002
93.550.0090.002
93.600.0090.002
93.650.0090.002
93.700.0090.003
93.750.0090.003
93.800.0090.003
93.850.0090.003
93.900.0090.004
93.950.0090.004
94.000.0090.004
94.050.0090.005
94.100.0090.005
94.150.0090.005
94.200.0090.005
94.250.0090.006
94.300.0090.006
94.350.0090.006
94.400.0090.007
94.450.0090.007
94.500.0090.007
94.550.0090.007
94.600.0090.008
94.650.0090.008
94.700.0090.008
94.750.0090.008
94.800.0090.008
94.850.0090.008
94.900.0090.008
94.950.0090.009
95.000.0090.009
95.050.0090.009
95.100.0090.009
95.150.0090.009
Page 213