Analysis - Proposed Conditions Prepared by Civil Core Consulting HydroCAD® 10.20-8a s/n 13637 © 2025 HydroCAD Software Solutions LLC
Multi-Event Tables Printed 12/19/2025 Page 451
Events for Link 34L: POA 3
EventInflow (cfs)Primary (cfs)Elevation (feet)
2 YR-C0.000.000.00
2 YR-F0.000.000.00
10 YR-C0.000.000.00
10 YR-F0.000.000.00
100 YR-C0.070.070.00
100 YR-F0.200.200.00