Analysis - Proposed ConditionsMulti-Event Tables
Prepared by Civil Core ConsultingPrinted 12/19/2025
HydroCAD\circledR 10.20-8a s/n 13637\circledC 2025 HydroCAD Software Solutions LLCPage 444

Events for Pond 8P: INFILTRATION BASIN 3

Events for Pound 8P. INFILTRATION BASIN 3
EventInflow (cfs)Outflow (cfs)Discarded (cfs)Primary (cfs)Elevation (feet)Storage (cubic-feet)
2 YR-C0.150.150.150.0090.766
2 YR-F0.270.270.270.0090.7613
10 YR-C0.670.270.270.0091.01294
10 YR-F0.940.270.270.0091.23548
100 YR-C1.590.340.270.0793.062,655
100 YR-F2.660.470.270.2094.404,201