NOAA 24-hr D 100 YR-F Rainfall=11.41" Printed 12/19/2025
Analysis - Proposed Conditions NOAA 24- Prepared by Civil Core Consulting HydroCAD® 10.20-8a s/n 13637 © 2025 HydroCAD Software Solutions LLC
Hydrograph for Pond 15P: PERVIOUS PAVEMENT 3B
Time (hours)Inflow (cfs)Storage (cubic-feet)Elevation (feet)Primary (cfs)
0.000.00093.800.00
2.000.027193.860.01
4.000.0314993.930.03
6.000.0418193.950.04
8.000.0623193.990.05
10.000.1035194.100.07
12.001.1499594.860.94
14.000.1182194.800.13
16.000.0653994.250.10
18.000.0432294.070.07
20.000.0420793.970.04
22.000.0317493.950.03
24.000.0315593.930.03
26.000.006693.860.01
28.000.004093.830.00
30.000.002893.820.00
32.000.002293.820.00
34.000.001893.820.00
36.000.001593.810.00
38.000.001393.810.00
40.000.001193.810.00
42.000.001093.810.00
44.000.00993.810.00
46.000.00893.810.00
48.000.00893.810.00
50.000.00793.810.00
52.000.00793.810.00
54.000.00693.810.00
56.000.00693.800.00
58.000.00593.800.00
60.000.00593.800.00
62.000.00593.800.00
64.000.00593.800.00
66.000.00493.800.00
68.000.00493.800.00
70.000.00493.800.00
72.000.00493.800.00