NOAA 24-hr D 100 YR-F Rainfall=11.41" Printed 12/19/2025 utions LLC Page 407
Analysis - Proposed Conditions NOAA 24- Prepared by Civil Core Consulting HydroCAD® 10.20-8a s/n 13637 © 2025 HydroCAD Software Solutions LLC
Hydrograph for Pond 10P: PERVIOUS PAVEMENT 2B
Time (hours)Inflow (cfs)Storage (cubic-feet)Elevation (feet)Primary (cfs)
0.000.00093.800.00
2.000.026893.860.01
4.000.0314893.920.02
6.000.0418193.950.03
8.000.0622993.990.05
10.000.1034294.080.07
12.001.081,02394.860.88
14.000.1187094.810.12
16.000.0667894.440.10
18.000.0438594.110.08
20.000.0322293.980.05
22.000.0317793.940.03
24.000.0215793.930.03
26.000.006993.860.01
28.000.004293.830.00
30.000.003093.820.00
32.000.002393.820.00
34.000.001993.820.00
36.000.001693.810.00
38.000.001493.810.00
40.000.001293.810.00
42.000.001193.810.00
44.000.001093.810.00
46.000.00993.810.00
48.000.00893.810.00
50.000.00893.810.00
52.000.00793.810.00
54.000.00793.810.00
56.000.00693.810.00
58.000.00693.800.00
60.000.00693.800.00
62.000.00593.800.00
64.000.00593.800.00
66.000.00593.800.00
68.000.00593.800.00
70.000.00493.800.00
72.000.00493.800.00