NOAA 24-hr D 100 YR-F Rainfall=11.41" Printed 12/19/2025 tions LLC Page 392
Analysis - Proposed Conditions NOAA 2 Prepared by Civil Core Consulting HydroCAD® 10.20-8a s/n 13637 © 2025 HydroCAD Software Solutions LLC
Summary for Pond 6P: BIORENTION BASIN 2A Inflow Area = 18,731 sf, 0.00% Impervious, Inflow Depth = 2.87" for 100 YR-F event Inflow = 0.86 cfs @ 12.18 hrs, Volume= 4,475 cf Outflow = 0.86 cfs @ 12.19 hrs, Volume= 4,428 cf, Atten= 0%, Lag= 0.3 min Primary = 0.86 cfs @ 12.19 hrs, Volume= 4,428 cf Routed to Pond 33P : INFILTRATION BASIN 2 Routing by Dyn-Stor-Ind method, Time Span= 0.00-72.00 hrs, dt= 0.01 hrs Peak Elev= 95.56' @ 12.19 hrs Surf.Area= 243 sf Storage= 183 cf Plug-Flow detention time= 16.6 min calculated for 4,428 cf (99% of inflow) Center-of-Mass det. time= 10.7 min ( 910.6 - 899.8 )
VolumeInvertAvail.StorageStorage Description
#194.30'307 cfCustom Stage Data (Prismatic)Listed below (Recalc)
Elevation (feet)Surf.Area (sq-ft)Inc.Store (cubic-feet)Cum.Store (cubic-feet)
94.306300
95.001487474
96.00319234307
DeviceRoutingInvertOutlet Devices
#1Device 394.80'2.5" Vert. Orifice C= 0.600Limited to weir flow at low heads
#2Device 395.50'48.0" x 48.0" Horiz. Grate C= 0.600 Limited to weir flow at low heads
#3Primary91.80'12.0" Round Culvert L= 30.0' RCP, groove end projecting, Ke= 0.200 Inlet / Outlet Invert= 91.80' / 91.65' S= 0.0050 ' /' Cc= 0.900 n= 0.012 Concrete pipe, finished, Flow Area= 0.79 sf
Primary OutFlow Max=0.86 cfs @ 12.19 hrs HW=95.56' TW=93.62' (Dynamic Tailwater) 3=Culvert (Passes 0.86 cfs of 6.20 cfs potential flow) 1=Orifice (Orifice Controls 0.13 cfs @ 3.89 fps) 2=Grate (Weir Controls 0.73 cfs @ 0.79 fps)